问题:单选题After upgrading the SNMP (Simple Network Management Protocol) protocol, the ()can be looked up. It is a sequence of integers that uniquely identifies a path to a managed object.A MIB (Management Information Base)B OID (ObjectIDentifier)C registerD ...
查看答案
问题:单选题Who is responsible for authorizing closure of the project?()A Project ManagerB StakeholderC CustomerD Executive Sponsor...
问题:单选题Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()A SE (Single Ended)B DE (Double Ended)C LV...
问题:单选题The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()A Evaluate phase exit...
问题:单选题Which type of server is responsible for resolving NetBIOS names?()A mail serverB DNS serverC web serverD WINS serverE DHCP server...
问题:单选题Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure. One server is configured as a local file server, and the other as a database server for a different network. The onsite technician noti...
问题:多选题Which three should be documented after upgrading a SCSI RAID controller?()Adisk utilizationBinstallation dateCadapter baselinesDlocation slot of the RAID controllerEstatus of the adapter card installationFRAID controller information (warranty, specific...
问题:单选题Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()A Developing key personnelB Leading technical specialistsC...
问题:单选题Why is it important to have a final meeting on a project that has been cancelled?()A Document lessons learnedB Assign responsibilityC Close budgetD Begin new project...
问题:单选题Which action increases server availability?()A configuring a second network card with a different IP addressB replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC using adapter teaming and configuring the second network card with the sam...
问题:单选题Which of the following techniques is used for tracking the project risks?()A Probability-Impact matrixB Pareto chartC R-ChartD PERT (Program Evaluation and Review Technique) analysis...
问题:单选题Team member listing, scheduled tasks, and risk identification are part of the:()A project plan.B project charter.C communication plan.D WBS (Work Breakdown Structure)....
问题:单选题A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. Th...
问题:单选题A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()A 0B 1C 4D 7...
问题:单选题A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive. After rebooting the server, the technician ...
问题:单选题Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()A multiple AIT (Advanced Intelligent Tape) drives configured for each serverB a standalone LTO (Linear ...
问题:单选题Why does a project manager need an executive sponsor?()A To keep the project team focused on its workB To provide behind-the-scenes assistance with organizational commitment and supportC To sign-off on user requirementsD To negotiate contracts with out...