第1题:
By which means is a contractor able to control cost overruns due to changing requirements?
A Project data review
B Change order
C Purchase order amendment
D Change control
E None of the above.
第2题:
19 It is argumentative whether project managers actually control costs. Which of the following is the most common element over which the project manager may have some degree of control?
A. Direct labor dollars
B. Direct labor hours.
C. Overhead rates.
D. Procurement costs.
E. None of the above
第3题:
151 Sources for data on activity durations and resource requirements can be gathered from which of the following:
A. Past project records (historical data)
B. Commercial techniques (standard practices, rules of thumb)
C. Past project team members knowledge (experience, oldtimers)
D. All of the above
E. A and C only
第4题:
2 Ice-Time Ltd (ITL) manufactures a range of sports equipment used in a variety of winter-sports in Snowland.
Development engineers within ITL have recently developed a prototype of a small engine-propelled bobsleigh named
the ‘Snowballer’, which has been designed for use by young children. The directors of ITL recently spent £200,000
on market research, the findings of which led them to believe that a market exists for the Snowballer.
The marketing director has suggested that ITL should use the ‘Olympic’ brand in order to market the Snowballer.
The finance director of ITL has gathered relevant information and prepared the following evaluation relating to the
proposed manufacture and sale of the Snowballer.
(1) Sales are expected to be 3,200 units per annum at a selling price of £2,500 per unit.
(2) Variable material, labour, and overhead costs are estimated at £1,490 per unit.
(3) In addition, a royalty of £150 per unit would be payable to Olympic plc, for the use of their brand name.
(4) Fixed overheads are estimated at £900,000 per annum. These overheads cannot be avoided until the end of the
year in which the Snowballer is withdrawn from the market.
(5) An initial investment of £5 million would be required. A government grant equal to 50% of the initial investment
would be received on the date the investment is made. However, because the Snowballer would be classified as
a luxury good, no tax allowances would be available on this initial investment. The estimated life cycle of the
Snowballer is six years.
(6) Corporation tax at the rate of 30% per annum is payable in the year in which profit occurs.
(7) All cash flows are stated in current prices and, with the exception of the initial investment and the government
grant, will occur at the end of each year.
(8) The nominal cost of capital is 15·44%. Annual inflation during the period is expected to amount to 4%.
Required:
(a) Calculate the net present value (NPV) of the Snowballer proposal and recommend whether it should be
undertaken by the directors of ITL. (4 marks)
第5题:
The project(73)is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria.
A.work performance information
B.scope statement
C.change requests
D.process analysis
第6题:
“Cost of quality”is a project management concept that includes cost of( 73)
A.exceedings requirements
B.Changes to the requirements
C.Ensuring conformance to requirements
D.The quality control requirements
第7题:
In all projects,needs must be tempered by schedule,cost and resource constraints.Project success depends primarily on (74)
A.the quality of the schedule and cost control analysis
B.customer satisfaction
C.customer compromise in defining its needs
D.exceeding customer requirements through gold-plating
第8题:
第9题:
A site administrator is configuring Resource-level access control. Which of the following statements about Resource-level access control are true? Resource-level access control policies:()
第10题:
You are designing a top-level OU structure to meet the business and technical requirements. Which top-evel OU or OUs should you use? ()
第11题:
Historical information
Use of outside vendors
Change control processes
Human resource skill level requirements
第12题:
proceedings
controls
forecastings
Prelibations
第13题:
144 Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:
A. Overhead rates, labor rates and material costs.
B. Overhead rates, schedule slippages, and rework.
C. Rework, cost-of-living adjustments, and overtime.
D. Material costs, shipping cost, and scope changes.
E. Labor rates, material costs, and cost reporting
第14题:
139 By which means is a contractor able to control cost overruns due to changing requirements? A. Project data review
B. Change order
C. Purchase order amendment
D. Change control
E. None of the above
第15题:
● Sources for data on activity durations and resource requirements can be gathered from which of the following:
A Past project records (historical data)
B Commercial techniques (standard practices, rules of thumb)
C Past project team members knowledge (experience, oldtimers)
D All of the above
E A and C only
第16题:
The project()is a key input to quality planning since it documents major project deliverables,the project objectives that serve to define important stakeholder requirements,thresholds,and acceptance criteria
A.work performance information
B.scope statement
C.change requests
D.process analysis
第17题:
●You have just taken control of a project in the middle of execution and need to learn who has approval authority for revisions in scope. (75)document provides this information.
(75) A. Resource assignment matrix
B. Change control plan
C. Project charter
D. Client organization chart
第18题:
( )is the approved version of the time-phased project budget,excluding any management reserves,which can only be changed through formal change control precedures and is used as a basis for comparison to actual results.
A.The control accounts
B.Funding requirement
C.The cost estimates
D.The cost baseline
第19题:
第20题:
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.
第21题:
Which factor has the greatest impact on the estimated per unit labor cost for a project?()
第22题:
You are designing a top-level OU structure to meet the business and technical requirements. Which top-evel OU or OUs should you use?()
第23题:
the use of excessive amounts of dunnage
the use of excessive amount of filler cargo
the failure to stow some item in neat and uniform rows and tiers
the skill, industry and interest of the longshoremen
第24题:
are optional
are used to protect data beans
provide coarse-grained access control
never specify a relationship