问题:单选题The project manager is developing a project schedule. The project manager negotiated with all the execution organizations, and the task times are as short as possible. After manipulating the schedule, the project completion date is still beyond the dat...
查看答案
问题:单选题What is the MOST accurate way to determine a project’s duration before execution?()A The project manager performs all estimatesB Incorporate each individual worker’s estimatesC Acquire expert estimatesD There is no way to determine the duration...
问题:单选题The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()A Evaluate phase exit...
问题:单选题Acceptance of deliverables to multiple locations requires which type of sign off?()A Design AcceptanceB Code AcceptanceC Module AcceptanceD Site Acceptance...
问题:单选题Why does a project manager need an executive sponsor?()A To keep the project team focused on its workB To provide behind-the-scenes assistance with organizational commitment and supportC To sign-off on user requirementsD To negotiate contracts with out...
问题:单选题Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure. One server is configured as a local file server, and the other as a database server for a different network. The onsite technician noti...
问题:单选题Who is responsible for authorizing closure of the project?()A Project ManagerB StakeholderC CustomerD Executive Sponsor...
问题:单选题A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()A 0B 1C 4D 7...
问题:单选题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()A replace the NICB install the latest SSU (System Setup...
问题:单选题Which throughput does a 33 MHz, 33-bit bus have?()A 132 MbpsB 256 MbpsC 264 MbpsD 450 Mbps...
问题:单选题Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()A SE (Single Ended)B DE (Double Ended)C LV...
问题:单选题Which RAID standard combines data striping across drives with mirroring?()A RAID 0+1B RAID 1+5C RAID 3D Hybrid RAID 5+...
问题:单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A by written and oral communication.B via a weekly status report.C through the formal chain of command.D with approved t...
问题:单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A Historical informationB Use of outside vendorsC Change control processesD Human resource skill level requirements...
问题:单选题A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive. After rebooting the server, the technician ...
问题:单选题What is a reason for reviewing the user requirements document with the client?()A To gain the client’s acceptance of the detailed designB To verify mutual understanding of project resourcesC To verify mutual understanding of the detailed project planD ...
问题:多选题A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hub...
问题:单选题The last deliverable at the Close Out meeting is:()A source code.B passwords.C lessons learned.D test results....