There are discolored ceiling tiles near the middle of the room.
Large amounts of dust have accumulated in the corners of the room.
The anti-static carpet has been removed resulting in a bare painted concrete floor.
A wet pipe water-based sprinkler system has been installed above the racks.
第1题:
The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()
第2题:
Routers can be used to integrate a variety of services. Which two common services are often specified by businesses?()
第3题:
Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose?()
第4题:
A finance company needs to increase its storage but has run out of floor space in the data center.Currently they have two ESS 800 systems with a total of 125 TB of System z data. Which of thefollowing IBM System Storage products would allow them to replace the ESS 800 systems,increase their performance, reduce their floor space, and still allow them room to grow?()
第5题:
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()
第6题:
You are evaluating the implementation of two Hyper-V hosts for the Web servers. You need to design a solution that will move the Web servers automatically between the Hyper-V hosts based on the physical resources available. Which software should you include in the design?()
第7题:
sector size and the amount of production data
existing RAID levels and the disk drive speed
sector size and existing RAID levels
amount of production data and the disk drive speed
第8题:
Hot site
Warm site
Cold site
Active failover site
第9题:
N5200
DS5020
DS5300
DS8700
第10题:
In each data center, deploy one Hub Transport server. Create and configure one Send connector.
In each data center, deploy two Hub Transport servers. Create and configure one Send connector.
In each data center, deploy one Edge Transport server. Create and configure two Send connectors.
In each data center, deploy two Edge Transport servers. Create and configure two Send connectors.
第11题:
Metro Mirror
FlashCopy
Global Mirror
Snapshot
第12题:
The room temperature has reached 23C (73.4F).
A Blade within the chassis has been shut down.
The ambient temperature in the data center has increased
One of the additional System X servers in the BladeCenter rack has failed.
第13题:
he requirement for high availability within the Data Center network may cause the designer toconsider which one of the following solutions?()
第14题:
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements? ()
第15题:
A customer has just obtained a second data center through the acquisition of a competitor. The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years. They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan. What product should the pSeries technical specialist recommend for this requirement?()
第16题:
A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()
第17题:
Examine the following RMAN script: RMAN> run { debug on; allocate channel c1 type disk; backup datafile 5; } Which statement describes the purpose of the script?()
第18题:
Your network contains two data centers named Datacenter1 and Datacenter2. An Active Directory site exists for each data center. The data centers connect to the Internet by using a direct link. The data centers connect to each other by using a high-speed WAN link. You plan to deploy Exchange Server 2010 Mailbox servers in both data centers. You need to plan message routing to meet the following requirements:.Ensure outbound delivery of e-mail messages if a single server fails .Automatically load balance the Hub Transport server in each site .Deploy the minimum number of servers What should you include in the plan?()
第19题:
The data file is checked for physical corruption and backed up if found clean.
The backup of data file 5 is performed and the interactive messages during the backup are suppressed.
The existing backup for the data file is checked and the backup is performed if there are changes in the data file after the last backup.
The backup of data file 5 is performed and all SQL statements that are executed during RMAN compilation and their results are displayed
第20题:
server replacement is as easy as replacing the physical blade
storage, computing and networking services are combined onto one blade
it is A pra-as-you-go incremental deployment
only one configuration is used for all blades
it leverages low-speed interfaces
第21题:
Construct a hierarchical network design using EtherChannel between a server and two VDCsfrom the same physical switch
Utilize Cisco NSF with SSO to provide intrachassis SSO at Layers 2 to 4
Define the Data Center as an OSPF NSSA area, advertising a default route into the DC And summarizing the routes out of the NSSA to the Campus Core
Implement network services for the Data Center as a separate services layer usingactive/active model that is more predictable in failure conditions
第22题:
p5-520 running Virtual I/O Server
p690 running AIX 5L V5.3
p5-510 running AIX 5L V5.2
p5-520 running two dedicated processor partitions
第23题:
CSM
TSM
NIM
Sysback