当前分类: IBM(000-106)
问题:单选题How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()A Use Capacity on Demand to add the resources.B Use DLPAR to add the resources and select the 'permanent' option.C Use DLPAR to add the resourc...
查看答案
问题:单选题A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to...
问题:单选题A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()A CoD and PCI hot-plugB DLPAR and Active Memory SharingC Hot node add and hot node ...
问题:单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will ...
问题:单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a min...
问题:单选题What is an advantage of using an HMC rather than IVM for system management?()A Support for a single VIO Server environmentB Adapters can be dedicated or virtual for each LPAR environmentC Interfaces with Systems Director to manage the Power Systems ser...
问题:单选题What are key benefits of IBM Systems Director Standard Edition?()A Backup data Manage problems Monitor network systemB Report problems Manage servers and virtual environment Monitor the network C Monitor system health and network Install and manage AIX...
问题:单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will h...
问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents ...
问题:单选题A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools. What is the minimum PowerVM E...
问题:单选题Which of the following has an integrated database?()A AIXB IBM iC LinuxD VIO Server...
问题:单选题A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this pro...
问题:单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable...
问题:单选题A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing lim...
问题:单选题On a POWER7 processor based server what is the minimum number of cores used by the Hypervisor to run four threads?()A 1B 2C 4D 8...
问题:单选题A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()A Reserve Capacity on DemandB Utility Capacity on DemandC Capacity ...
问题:单选题A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()A...
问题:单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potentia...
问题:单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A Verification of the expected performance of the new solution.B...