单选题What is an advantage of using an HMC rather than IVM for system management?()A Support for a single VIO Server environmentB Adapters can be dedicated or virtual for each LPAR environmentC Interfaces with Systems Director to manage the Power Systems ser

题目
单选题
What is an advantage of using an HMC rather than IVM for system management?()
A

Support for a single VIO Server environment

B

Adapters can be dedicated or virtual for each LPAR environment

C

Interfaces with Systems Director to manage the Power Systems servers

D

Supports multiple Power Systems servers from a single point of control


相似考题
更多“单选题What is an advantage of using an HMC rather than IVM for system management?()A Support for a single VIO Server environmentB Adapters can be dedicated or virtual for each LPAR environmentC Interfaces with Systems Director to manage the Power Systems ser”相关问题
  • 第1题:

    A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()

    • A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
    • B、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.
    • C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.
    • D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.

    正确答案:C

  • 第2题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第3题:

    Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

    • A、AIX
    • B、IBMi
    • C、Linux
    • D、VIO Server

    正确答案:B

  • 第4题:

    What is an advantage of using an HMC rather than IVM for system management?()

    • A、Support for a single VIO Server environment
    • B、Adapters can be dedicated or virtual for each LPAR environment
    • C、Interfaces with Systems Director to manage the Power Systems servers
    • D、Supports multiple Power Systems servers from a single point of control

    正确答案:D

  • 第5题:

    A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()

    • A、An HMC is required for dual VIO servers.
    • B、Dual VIO servers require a split backplane.
    • C、A dual VIO enablement code must be entered from the ASMI interface.
    • D、The second VIO server must be created using the IVM command line interface.

    正确答案:A

  • 第6题:

    An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()

    • A、Power 770 servers
    • B、Power 750 servers
    • C、Power 755 servers
    • D、Power 720 servers

    正确答案:A

  • 第7题:

    单选题
    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
    A

    Purchase a second HMC and use this to manage the new servers.

    B

    Connect all of the new servers to the existing private HMC network.

    C

    Configure a second private network on their existing HMC for the new servers.

    D

    Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.  Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()
    A

    Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.

    B

    Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.

    C

    Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.

    D

    Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
    A

    A VIO server requires a dedicated LHEA port.

    B

    There is a limit of 32 LPARs per virtual LAN.

    C

    Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.

    D

    Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
    A

     It has a GUI interface for upgrading system firmware. 

    B

     It creates and manages AIX/Linux and VIOS type LPARs. 

    C

     It can be managed by the Hardware Management Console (HMC). 

    D

     It supports Live Partition Mobility on POWER6 systems and above.


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
    A

    Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs

    B

    Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.

    C

    Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.

    D

    Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
    A

     Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.

    B

     Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.

    C

     Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.

    D

     Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.


    正确答案: D
    解析: 暂无解析

  • 第13题:

    A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()

    • A、Interconnect the service processors and use the IBM Director Agent
    • B、Install RSA II in each server and chain together the systems management processors
    • C、Install the RSA II in the top server and chain together the service processor interconnect
    • D、Install the IBM Director Agent on each server and use the remote control function to restart the servers

    正确答案:C

  • 第14题:

    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

    • A、Purchase a second HMC and use this to manage the new servers.
    • B、Connect all of the new servers to the existing private HMC network.
    • C、Configure a second private network on their existing HMC for the new servers.
    • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

    正确答案:B

  • 第15题:

    Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()

    • A、 It has a GUI interface for upgrading system firmware. 
    • B、 It creates and manages AIX/Linux and VIOS type LPARs. 
    • C、 It can be managed by the Hardware Management Console (HMC). 
    • D、 It supports Live Partition Mobility on POWER6 systems and above.

    正确答案:D

  • 第16题:

    A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()

    • A、A VIO server requires a dedicated LHEA port.
    • B、There is a limit of 32 LPARs per virtual LAN.
    • C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
    • D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

    正确答案:A

  • 第17题:

    System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()

    • A、The LPAR Configuration backup is corrupt
    • B、The LPAR Configuration has been altered using DLPAR
    • C、The LPAR Configuration backup was performed on a different HMC
    • D、The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed

    正确答案:B

  • 第18题:

    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()

    • A、Each Linux application can run in a Workload Partition, reducing the management efforts.
    • B、Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.
    • C、Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.
    • D、Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.

    正确答案:D

  • 第19题:

    单选题
    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
    A

    All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later

    B

    The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC

    C

    They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one

    D

    The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()
    A

    The LPAR Configuration backup is corrupt

    B

    The LPAR Configuration has been altered using DLPAR

    C

    The LPAR Configuration backup was performed on a different HMC

    D

    The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    What is an advantage of using an HMC rather than IVM for system management?()
    A

    Support for a single VIO Server environment

    B

    Adapters can be dedicated or virtual for each LPAR environment

    C

    Interfaces with Systems Director to manage the Power Systems servers

    D

    Supports multiple Power Systems servers from a single point of control


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()
    A

    Each Linux application can run in a Workload Partition, reducing the management efforts.

    B

    Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.

    C

    Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.

    D

    Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()
    A

    Interconnect the service processors and use the IBM Director Agent

    B

    Install RSA II in each server and chain together the systems management processors

    C

    Install the RSA II in the top server and chain together the service processor interconnect

    D

    Install the IBM Director Agent on each server and use the remote control function to restart the servers


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
    A

    An HMC is required for dual VIO servers.

    B

    Dual VIO servers require a split backplane.

    C

    A dual VIO enablement code must be entered from the ASMI interface.

    D

    The second VIO server must be created using the IVM command line interface.


    正确答案: D
    解析: 暂无解析