A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第1题:
Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
第2题:
A customer has a wide range of IBM enterprise disk systems and wants to manage copy services functions. Which of the products should the storage specialist recommend to this customer()
第3题:
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
第4题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
第5题:
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
第6题:
A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()
第7题:
Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()
第8题:
A graphics monitor must be attached to the server
Cluster System Management (CSM) software must be installed
The LPAR system must have an Hardware Management Console (HMC) connected
Each LPAR must be configured with a CDROM for operating system installation
第9题:
Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line.
The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed.
If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run.
The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
第10题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第11题:
lssysres -r cpu -m 9117-MMA*6512345 -r sys
lssyscfg -r proc -m 9117-MMA*6512345 -r sys
lshwres -r proc -m 9117-MMA*6512345 --level sys
lshwcfg -r proc -m 9117-MMA*6512345 --level sys
第12题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第13题:
Prior to implementing an LPAR system, which of the following needs to be done?()
第14题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第15题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第16题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第17题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第18题:
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()
第19题:
Order a POWER5 HMC
Connect to the existing HMC
Install an 8-port asynchronous card in the managed server to connect to the existing HMC
Install an additional network card to the existing HMC and connect to the POWER5 service processor
第20题:
The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).
The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).
第21题:
To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from
第22题:
It has a GUI interface for upgrading system firmware.
It creates and manages AIX/Linux and VIOS type LPARs.
It can be managed by the Hardware Management Console (HMC).
It supports Live Partition Mobility on POWER6 systems and above.
第23题:
ITSO Redbooks