单选题A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()A T

题目
单选题
A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
A

The Blades must use the same CIOv and CFFh expansion adapter types.

B

Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86  Blades.

C

The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades  are in bays 1-7 and the x86 Blades are in slots 8-14.

D

The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).


相似考题
更多“单选题A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()A T”相关问题
  • 第1题:

    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()

    • A、6
    • B、8
    • C、10
    • D、12

    正确答案:C

  • 第2题:

    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()

    • A、A p650 running AIX v5.3
    • B、A p5-550 running AIX v5.3
    • C、A p5-570 running Advanced POWER Virtualization
    • D、Multiple rack-mounted p615s running dynamic LPAR

    正确答案:C

  • 第3题:

    An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()

    • A、POWER7 servers running AIX 5.3 operate in POWER5+ mode.
    • B、POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.
    • C、POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.
    • D、POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.

    正确答案:B

  • 第4题:

    A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()

    • A、One 50 GB SATA 1.8 inch SSD
    • B、Two 73GB 10K SAS HDD SFF
    • C、Two 31 GB SATA 2.5 inch SSD
    • D、Two 50GB SATA 1.8 inch SSD

    正确答案:C

  • 第5题:

    A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()

    • A、Two additional power supplies
    • B、Fibre Channel (FC) switches and SAN storage
    • C、A Nortel 1/10 GB ESM
    • D、SSD for the HX5

    正确答案:A

  • 第6题:

    A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()

    • A、A power module has failed and there is not enough power to see video on all blades.
    • B、MUX 3 on theBladeCenter backplane has failed.
    • C、A firmware update is required on the AMM.
    • D、A second AMM is required to view video on blades 9-14.

    正确答案:B

  • 第7题:

    单选题
    A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()
    A

    32U

    B

    21U

    C

    25U

    D

    22U


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
    A

    A p650 running AIX v5.3

    B

    A p5-550 running AIX v5.3

    C

    A p5-570 running Advanced POWER Virtualization

    D

    Multiple rack-mounted p615s running dynamic LPAR


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
    A

    The Blades must use the same CIOv and CFFh expansion adapter types.

    B

    Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86  Blades.

    C

    The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades  are in bays 1-7 and the x86 Blades are in slots 8-14.

    D

    The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()
    A

    6

    B

    8

    C

    10

    D

    12


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()
    A

    4

    B

    3

    C

    2

    D

    8


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
    A

    One 50 GB SATA 1.8 inch SSD

    B

    Two 73GB 10K SAS HDD SFF

    C

    Two 31 GB SATA 2.5 inch SSD

    D

    Two 50GB SATA 1.8 inch SSD


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()

    • A、12 
    • B、10 
    • C、8 
    • D、6

    正确答案:B

  • 第14题:

    Which of the following solutions provides maximum core density per rack?()

    • A、Power 730
    • B、PS700 Blades
    • C、PS702 Blades
    • D、PS703 Blades

    正确答案:C

  • 第15题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第16题:

    A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()

    • A、32U 
    • B、25U 
    • C、22U 
    • D、21U

    正确答案:B

  • 第17题:

    A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H.  What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()

    • A、SAN Switch modules
    • B、Blowers
    • C、Power supplies
    • D、Battery backup units

    正确答案:A

  • 第18题:

    单选题
    A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()
    A

    A power module has failed and there is not enough power to see video on all blades.

    B

    MUX 3 on theBladeCenter backplane has failed.

    C

    A firmware update is required on the AMM.

    D

    A second AMM is required to view video on blades 9-14.


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
    A

    PowerVM Standard Edition

    B

    VMControl Standard Edition

    C

    Hardware Management Console

    D

    IBM Systems Director Standard Edition


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()
    A

    Two additional power supplies

    B

    Fibre Channel (FC) switches and SAN storage

    C

    A Nortel 1/10 GB ESM

    D

    SSD for the HX5


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()
    A

    32U 

    B

    25U 

    C

    22U 

    D

    21U


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
    A

    12 

    B

    10 

    C

    8 

    D

    6


    正确答案: D
    解析: 暂无解析

  • 第23题:

    多选题
    Which two factors determine the recommended maximum number of virtual interfaces on a Cisco UCSsystem?()
    A

    the number of computer blades in the system

    B

    the number of interfaces sharing the uplinks

    C

    the driver version on the OS running on the computer blade

    D

    the number of uplinks between I/O Module and Fabric Interconnect


    正确答案: B,D
    解析: 暂无解析