A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
第1题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()
第2题:
A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()
第3题:
Which of the following solutions provides maximum core density per rack?()
第4题:
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
第5题:
A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()
第6题:
Which of the following lists of items all require an HMC to function with POWER5?()
第7题:
A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()
第8题:
PowerVM Standard Edition
VMControl Standard Edition
Hardware Management Console
IBM Systems Director Standard Edition
第9题:
Two additional power supplies
Fibre Channel (FC) switches and SAN storage
A Nortel 1/10 GB ESM
SSD for the HX5
第10题:
POWER7 servers running AIX 5.3 operate in POWER5+ mode.
POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.
POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.
POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.
第11题:
the number of computer blades in the system
the number of interfaces sharing the uplinks
the driver version on the OS running on the computer blade
the number of uplinks between I/O Module and Fabric Interconnect
第12题:
SAN Switch modules
Blowers
Power supplies
Battery backup units
第13题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
第14题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第15题:
An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()
第16题:
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
第17题:
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()
第18题:
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
第19题:
The Blades must use the same CIOv and CFFh expansion adapter types.
Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.
The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.
The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
第20题:
A p650 running AIX v5.3
A p5-550 running AIX v5.3
A p5-570 running Advanced POWER Virtualization
Multiple rack-mounted p615s running dynamic LPAR
第21题:
The Blades must use the same CIOv and CFFh expansion adapter types.
Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.
The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.
The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
第22题:
12
10
8
6
第23题:
One 50 GB SATA 1.8 inch SSD
Two 73GB 10K SAS HDD SFF
Two 31 GB SATA 2.5 inch SSD
Two 50GB SATA 1.8 inch SSD