当前分类: IBM(000-106)
问题:单选题A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run wind...
查看答案
问题:单选题How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()A Use Capacity on Demand to add the resources.B Use DLPAR to add the resources and select the 'permanent' option.C Use DLPAR to add the resourc...
问题:单选题A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()A Reserve Capacity on DemandB Utility Capacity on DemandC Capacity ...
问题:单选题While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()A NPIV andvSCSI both require multipathing in VIO Server only.B NPIV...
问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents ...
问题:单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will ...
问题:单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and ...
问题:单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 fi...
问题:单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A AIXB IBM iC LinuxD VIO Server...
问题:单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A Power 710B Power 720C Power 730D Power 740...
问题:单选题A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in the following configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host; 1 hosted IBM i partition...
问题:单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()A Upgrade to VMControl St...
问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirem...
问题:单选题Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations. Which of the following allow...
问题:单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition in...
问题:单选题Which of the following has an integrated database?()A AIXB IBM iC LinuxD VIO Server...
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer'...
问题:单选题A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ...
问题:单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard E...