e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第1题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
第2题:
What current IBM resource can be used for simple-to-complex configurations and can be exported in different formats for the pricing of System x, BladeCenter and System x storage products?()
第3题:
A customer would like to see the components needed to perform an upgrade on their DS5100system and get a list price of the cost. What tool can the storage specialist use to generate thisdocument?()
第4题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第5题:
Which command do you issue to upgrade the current software on Junos devices?()
第6题:
1
2
4
6
第7题:
e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第8题:
e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第9题:
Run the mbsacli.exe command.
Run the winnt32.exe /checkupgradeonly command.
Run the Microsoft Windows Vista Upgrade Advisor application.
Compare the Microsoft Windows XP Professional system hardware against the Microsoft Windows Vista Hardware Compatibility List (HCL).
第10题:
What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第11题:
request system software replace
request system software install
request system software add
request system software upgrade
第12题:
eConfig
IBM Blue Horizon
Standalone Solution Configuration Tool (SSCT)
Configuration Management Version Control (CMVC)
第13题:
A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()
第14题:
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()
第15题:
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()
第16题:
A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
第17题:
Your computer runs Microsoft Windows XP Professional. The computer also runs 20 third-party applications. You plan to upgrade your computer to Microsoft Windows Vista. The functionality of the existing 20 applications must be maintained even after you upgrade your computer. You need to ascertain whether the hardware and software on the Windows XP Professional computer will support the upgrade. What should you do?()
第18题:
Assess the existing environments to determine if it can support the proposed system.
Identify the activities for installing and configuring the equipment at the customer sites.
Gather high-level solution requirements, and understand the customer business needs an the opportunity.
Prepare the activities for day-to-day support, management, and monitoring of the newly implemented system.
第19题:
use Storage Manager to export the system profile
create a configuration ineConfig and provide proof of purchase
use the IBM Standalone Systems Configuration Tool (SSCT) to recreate the configuration
have the customer contact the IBM AAS coordinator to retrieve a copy of the originalconfiguration
第20题:
Request that the pSeries technical specialist provide the discount percentage to the customer.
Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.
Confirm with the customer that the installed inventory accurately reflects what is actually installed.
Provide options to the customer so they can choose the most appropriate upgrade for their environment.
第21题:
PowerVM Standard Edition on POWER6 hardware
PowerVM Standard Edition with POWER5 hardware
PowerVM Enterprise Edition with POWER6 hardware
PowerVM Enterprise Edition with POWER5 hardware
第22题:
A public internet connection
All of the Logical Partitions need to be active
One partition must be configured with Service Authority
A local Repository must be configured prior to the update
第23题:
What version of AIX is needed?
Which SWMA offering is needed?
What kind of network is the system being attached to?
What kind of memory should be configured on the system?
第24题:
ITSO Redbooks
Facts and Features
System Planning Tool
Fix Level Recommendation Tool