单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable

题目
单选题
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
A

A second IVE adapter

B

A second processor card

C

PowerVM Enterprise Edition

D

An additional cable-management arm


相似考题
更多“单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable”相关问题
  • 第1题:

    A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem.  They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24.  The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement.  Which two are likely reasons why implementing network adapter teaming has not improved performance?()

    • A、 Adapter teaming is designed to work with switches.
    • B、 Adapter teaming only functions with gigabit network cards.
    • C、 Adapter teaming only provides fault tolerance, not additional bandwidth.
    • D、 Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.

    正确答案:A,D

  • 第2题:

    A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()

    • A、Order a 2-port 1Gbps Ethernet LAN adapter.
    • B、Order a 2-port 10Gbps Ethernet LAN adapter.
    • C、Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.
    • D、Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.

    正确答案:A

  • 第3题:

    When using a mksysb and base media to clone a system, which of the following will cause the installation to fail()

    • A、mksysb made on a single processor machine but is being installed on a multiple processor machine, no editing of the image.data file
    • B、mksysb made on machine with mirrored rootvg and new machine only has one disk in rootvg, no editing of the image.data file
    • C、mksysb made on a machine with 32GB of RAM but being installed on a machine with only 8GB of RAM
    • D、mksysb made on a machine with virtual Ethernet adapter but being installed on a machine which only has a physical Ethernet adapter

    正确答案:B

  • 第4题:

    A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()

    • A、A second IVE adapter
    • B、A second processor card
    • C、PowerVM Enterprise Edition
    • D、An additional cable-management arm

    正确答案:B

  • 第5题:

    Company.com is having trouble installing a fresh AIX image onto a newly defined partition on a p5-520. The assignment of the adapters to the each of the partitions is as follows: Fibre Channel Card 01 - partition one - required  Fibre Channel Card 02 - partition one - required  SCSI adapter 01 - partition one - desired  IDE adapter 01 - partition one - required  Ethernet adapter 01 - partition one - required  Ethernet adapter 01 - partition two - required  SCSI adapter 02 - partition two - required  IDE adapter 01 - partition two - desired  Which of the following actions will enable the installation of the AIX image?()

    • A、Change the IDE adapter from desired to required in partition two and restart the partition to release the resource.
    • B、Purchase a SCSI DVD-ROM drive to connect to the SCSI adapter in partition two.
    • C、Purchase an LTO tape drive so that a system image backup can be created to install a new AIX partition.
    • D、Change the IDE adapter from required to desired in partition one and restart the partition to release the resource.

    正确答案:D

  • 第6题:

    Company.com has I/O slot constraints on two nodes that are going to be configured in an  HACMP cluster. There is room for only one Network Interface Card in each node,in addition to the built-in Ethernet port on the system planer.  The best HACMP configuration for these servers is to implement:()  

    • A、 A single adapter network using the Network Interface Card in each node
    • B、 A single adapter network using persistent addresses on the Network Interface Card in each node
    • C、 A dual adapter network using the internal Ethernet adapters as an non-service interface with IPAT via IP Replacement.
    • D、 EtherChannel high availability for the network connections with HACMP cascading resource groups for data and application fallover

    正确答案:C

  • 第7题:

    单选题
    A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.  Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
    A

    Order a 2-port 1Gbps Ethernet LAN adapter.

    B

    Order a 2-port 10Gbps Ethernet LAN adapter.

    C

    Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.

    D

    Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
    A

    The new system requires 1 installed processor card for the GX++ bus adapter

    B

    The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter

    C

    The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter

    D

    The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
    A

    A second IVE adapter

    B

    A second processor card

    C

    PowerVM Enterprise Edition

    D

    An additional cable-management arm


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
    A

    Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.

    B

    Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.

    C

    Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.

    D

    Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()
    A

    Etherchannel and trunking

    B

    Network Interface Backup and Etherchannel

    C

    Shared Ethernet Adapter (SEA) Failover and Etherchannel

    D

    Network Interface Backup and Shared Ethernet Adapter failover


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A server has two PCI-X buses with four Active PCI-X slots.  Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one.  After the server has been installed and configured, the server must  be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz.  The customer’s priority is to have no downtime, and performance is secondary.   Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()
    A

    Adapter A in slot 1, adapter B in slot 4 and hot-add adapter C in slot 3

    B

    Adapter A in slot 1, adapter B in slot 3 and hot-add adapter C in slot 2

    C

    Adapter A in slot 2, adapter B in slot 4 and hot-add adapter C in slot 3

    D

    Adapter A in slot 3, adapter B in slot 1 and hot-add adapter C in slot 4


    正确答案: D
    解析: 暂无解析

  • 第13题:

    A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()

    • A、1
    • B、7
    • C、15
    • D、31

    正确答案:D

  • 第14题:

    A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()

    • A、No upgrades are needed.
    • B、Add another 16-port RAN.
    • C、Add an 8-port async adapter.
    • D、Add an additional 128-port adapter.

    正确答案:C

  • 第15题:

    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()

    • A、The new system requires 1 installed processor card for the GX++ bus adapter
    • B、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
    • C、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
    • D、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

    正确答案:B

  • 第16题:

    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()

    • A、Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.
    • B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.
    • C、Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.
    • D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.

    正确答案:D

  • 第17题:

    A server has two PCI-X buses with four Active PCI-X slots.  Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one.  After the server has been installed and configured, the server must  be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz.  The customer’s priority is to have no downtime, and performance is secondary.   Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()

    • A、Adapter A in slot 1, adapter B in slot 4 and hot-add adapter C in slot 3
    • B、Adapter A in slot 1, adapter B in slot 3 and hot-add adapter C in slot 2
    • C、Adapter A in slot 2, adapter B in slot 4 and hot-add adapter C in slot 3
    • D、Adapter A in slot 3, adapter B in slot 1 and hot-add adapter C in slot 4

    正确答案:B

  • 第18题:

    单选题
    When using a mksysb and base media to clone a system, which of the following will cause the installation to fail()
    A

    mksysb made on a single processor machine but is being installed on a multiple processor machine, no editing of the image.data file

    B

    mksysb made on machine with mirrored rootvg and new machine only has one disk in rootvg, no editing of the image.data file

    C

    mksysb made on a machine with 32GB of RAM but being installed on a machine with only 8GB of RAM

    D

    mksysb made on a machine with virtual Ethernet adapter but being installed on a machine which only has a physical Ethernet adapter


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()
    A

    1

    B

    7

    C

    15

    D

    31


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    Company.com is having trouble installing a fresh AIX image onto a newly defined partition on a p5-520. The assignment of the adapters to the each of the partitions is as follows: Fibre Channel Card 01 - partition one - required  Fibre Channel Card 02 - partition one - required  SCSI adapter 01 - partition one - desired  IDE adapter 01 - partition one - required  Ethernet adapter 01 - partition one - required  Ethernet adapter 01 - partition two - required  SCSI adapter 02 - partition two - required  IDE adapter 01 - partition two - desired  Which of the following actions will enable the installation of the AIX image?()
    A

    Change the IDE adapter from desired to required in partition two and restart the partition to release the resource.

    B

    Purchase a SCSI DVD-ROM drive to connect to the SCSI adapter in partition two.

    C

    Purchase an LTO tape drive so that a system image backup can be created to install a new AIX partition.

    D

    Change the IDE adapter from required to desired in partition one and restart the partition to release the resource.


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
    A

    A second IVE adapter

    B

    A second processor card

    C

    PowerVM Enterprise Edition

    D

    An additional cable-management arm


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()
    A

    No upgrades are needed.

    B

    Add another 16-port RAN.

    C

    Add an 8-port async adapter.

    D

    Add an additional 128-port adapter.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    Company.com has I/O slot constraints on two nodes that are going to be configured in an  HACMP cluster. There is room for only one Network Interface Card in each node,in addition to the built-in Ethernet port on the system planer.  The best HACMP configuration for these servers is to implement:()
    A

     A single adapter network using the Network Interface Card in each node

    B

     A single adapter network using persistent addresses on the Network Interface Card in each node

    C

     A dual adapter network using the internal Ethernet adapters as an non-service interface with IPAT via IP Replacement.

    D

     EtherChannel high availability for the network connections with HACMP cascading resource groups for data and application fallover


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()
    A

    One processor card and one GX+ expansion card

    B

    Two processor cards and one GX++ expansion card

    C

    One processor card, one GX+ expansion card, and one GX++ expansion card

    D

    Two processor cards, one GX+ expansion card, and one GX++ expansion card


    正确答案: B
    解析: 暂无解析