What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()
第1题:
Company.com wants to reassign a host bus adapter (HBA) from one partition to another to handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()
第2题:
A customer is deploying a wireless core feature set using autonomous access points and requires Layer 2 roaming. What is a requirement when deploying this solution?()
第3题:
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
第4题:
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
第5题:
Company.com is having trouble installing a fresh AIX image onto a newly defined partition on a p5-520. The assignment of the adapters to the each of the partitions is as follows: Fibre Channel Card 01 - partition one - required Fibre Channel Card 02 - partition one - required SCSI adapter 01 - partition one - desired IDE adapter 01 - partition one - required Ethernet adapter 01 - partition one - required Ethernet adapter 01 - partition two - required SCSI adapter 02 - partition two - required IDE adapter 01 - partition two - desired Which of the following actions will enable the installation of the AIX image?()
第6题:
The new system requires 1 installed processor card for the GX++ bus adapter
The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
第7题:
configuring a second network card with a different IP address
replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
using adapter teaming and configuring the second network card with the same IP address as the first network card
installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
第8题:
at
in
for
up
第9题:
The wild card mask
The IP address
The IP address mask
The metric weights
The Autonomous System number
第10题:
one route processor (RP) Card and one modular services card (MSC)
one distributed route processor (DRP) and one S13 fabric card (SFC)
one line card chassis (LCC) and one fabric card chassis (FCC)
one route processor (RP) and one fabric card chassis (FCC)
one line card chassis (LCC) and one S13 fabric card (SFC)
第11题:
Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
Smallest partition one processor, as small 1% of a processor may be transferred.
Smallest partition one core, as small 10% of a processor may be transferred.
第12题:
Use the rmdev command to remove the card from the current partition before doing the DLPAR process.
Take the source partition down and do the DLPAR function on the target partition.
Assign the card to the required section of the target partition and run cfgmgr.
Dynamically remove the card from the source and add to target profile then reactivate the target profile.
第13题:
A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()
第14题:
Which action increases server availability?()
第15题:
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
第16题:
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
第17题:
Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line.
The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed.
If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run.
The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
第18题:
A second IVE adapter
A second processor card
PowerVM Enterprise Edition
An additional cable-management arm
第19题:
compression ratio of the engine
volume of the engine
relationships between pressure and volume during one stroke of the engine
relationships between pressure and volume during one cycle of the engine
第20题:
第21题:
a minimum of one Cisco 4100 Series WLAN Controller
one WDS per subnet
a minimum of one Wireless LAN Services Module
all clients using Cisco Aironet Wireless LAN Adapters
第22题:
One processor card and one GX+ expansion card
Two processor cards and one GX++ expansion card
One processor card, one GX+ expansion card, and one GX++ expansion card
Two processor cards, one GX+ expansion card, and one GX++ expansion card
第23题:
Install the two cards in slots 5 and 6 in the x445.
Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.
Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.
Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.