What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()A、one route processor (RP) Card and one modular services card (MSC)B、one distributed route processor (DRP) and one S13 fabric card (SFC)C、one line card chassis (LCC) and on

题目

What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()

  • A、one route processor (RP) Card and one modular services card (MSC)
  • B、one distributed route processor (DRP) and one S13 fabric card (SFC)
  • C、one line card chassis (LCC) and one fabric card chassis (FCC)
  • D、one route processor (RP) and one fabric card chassis (FCC)
  • E、one line card chassis (LCC) and one S13 fabric card (SFC)

相似考题
更多“What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()A、one route processor (RP) Card and one modular services card (MSC)B、one distributed route processor (DRP) and one S13 fabric card (SFC)C、one line card chassis (LCC) and on”相关问题
  • 第1题:

    Company.com wants to reassign a host bus adapter (HBA) from one partition to another to  handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()

    • A、Use the rmdev command to remove the card from the current partition before doing the DLPAR process.
    • B、Take the source partition down and do the DLPAR function on the target partition.
    • C、Assign the card to the required section of the target partition and run cfgmgr.
    • D、Dynamically remove the card from the source and add to target profile then reactivate the target profile.

    正确答案:A

  • 第2题:

    A customer is deploying a wireless core feature set using autonomous access points and requires Layer 2 roaming. What is a requirement when deploying this solution?()

    • A、 a minimum of one Cisco 4100 Series WLAN Controller
    • B、 one WDS per subnet
    • C、 a minimum of one Wireless LAN Services Module
    • D、 all clients using Cisco Aironet Wireless LAN Adapters

    正确答案:B

  • 第3题:

    A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()

    • A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
    • B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
    • C、Smallest partition one processor, as small 1% of a processor may be transferred.
    • D、Smallest partition one core, as small 10% of a processor may be transferred.

    正确答案:B

  • 第4题:

    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()

    • A、The new system requires 1 installed processor card for the GX++ bus adapter
    • B、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
    • C、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
    • D、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

    正确答案:B

  • 第5题:

    Company.com is having trouble installing a fresh AIX image onto a newly defined partition on a p5-520. The assignment of the adapters to the each of the partitions is as follows: Fibre Channel Card 01 - partition one - required  Fibre Channel Card 02 - partition one - required  SCSI adapter 01 - partition one - desired  IDE adapter 01 - partition one - required  Ethernet adapter 01 - partition one - required  Ethernet adapter 01 - partition two - required  SCSI adapter 02 - partition two - required  IDE adapter 01 - partition two - desired  Which of the following actions will enable the installation of the AIX image?()

    • A、Change the IDE adapter from desired to required in partition two and restart the partition to release the resource.
    • B、Purchase a SCSI DVD-ROM drive to connect to the SCSI adapter in partition two.
    • C、Purchase an LTO tape drive so that a system image backup can be created to install a new AIX partition.
    • D、Change the IDE adapter from required to desired in partition one and restart the partition to release the resource.

    正确答案:D

  • 第6题:

    单选题
    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
    A

    The new system requires 1 installed processor card for the GX++ bus adapter

    B

    The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter

    C

    The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter

    D

    The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter


    正确答案: D
    解析: 暂无解析

  • 第7题:

    单选题
    Which action increases server availability?()
    A

     configuring a second network card with a different IP address

    B

     replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC

    C

     using adapter teaming and configuring the second network card with the same IP address as the first network card

    D

     installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    The discount card given to our frequent buyers is valid ______ one year.
    A

    at

    B

    in

    C

    for

    D

    up


    正确答案: A
    解析:
    句意:赠送给老主顾的打折卡有效期为一年。此处意为“有效期为一年”。表示一段时间时,用介词for。

  • 第9题:

    单选题
    Which one of the following parameters is the very first thing that needs to be configured as part of the IGRP routing process?()
    A

    The wild card mask

    B

    The IP address

    C

    The IP address mask

    D

    The metric weights

    E

    The Autonomous System number


    正确答案: E
    解析: 暂无解析

  • 第10题:

    单选题
    What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()
    A

    one route processor (RP) Card and one modular services card (MSC)

    B

    one distributed route processor (DRP) and one S13 fabric card (SFC)

    C

    one line card chassis (LCC) and one fabric card chassis (FCC)

    D

    one route processor (RP) and one fabric card chassis (FCC)

    E

    one line card chassis (LCC) and one S13 fabric card (SFC)


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
    A

    Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.

    B

    Smallest partition 10% of a processor, as small 1% of a processor may be transferred.

    C

    Smallest partition one processor, as small 1% of a processor may be transferred.

    D

    Smallest partition one core, as small 10% of a processor may be transferred.


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Company.com wants to reassign a host bus adapter (HBA) from one partition to another to  handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()
    A

    Use the rmdev command to remove the card from the current partition before doing the DLPAR process.

    B

    Take the source partition down and do the DLPAR function on the target partition.

    C

    Assign the card to the required section of the target partition and run cfgmgr.

    D

    Dynamically remove the card from the source and add to target profile then reactivate the target profile.


    正确答案: D
    解析: 暂无解析

  • 第13题:

    A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()

    • A、 One, two, three or four processors
    • B、 One, two, or three processors
    • C、 One, three, or four processors
    • D、 One, two or four processors

    正确答案:D

  • 第14题:

    Which action increases server availability?()

    • A、 configuring a second network card with a different IP address
    • B、 replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
    • C、 using adapter teaming and configuring the second network card with the same IP address as the first network card
    • D、 installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps

    正确答案:C

  • 第15题:

    Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()

    • A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 
    • B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 
    • C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 
    • D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 

    正确答案:B

  • 第16题:

    A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()

    • A、A second IVE adapter
    • B、A second processor card
    • C、PowerVM Enterprise Edition
    • D、An additional cable-management arm

    正确答案:B

  • 第17题:

    单选题
    Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
    A

    Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 

    B

    The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 

    C

    If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 

    D

    The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 


    正确答案: C
    解析: 暂无解析

  • 第18题:

    单选题
    A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
    A

    A second IVE adapter

    B

    A second processor card

    C

    PowerVM Enterprise Edition

    D

    An additional cable-management arm


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    An indicator card or pressure-volume diagram, shows graphically the ()
    A

    compression ratio of the engine

    B

    volume of the engine

    C

    relationships between pressure and volume during one stroke of the engine

    D

    relationships between pressure and volume during one cycle of the engine


    正确答案: D
    解析: 暂无解析

  • 第20题:

    填空题
    Among the typically essential debts in our lives, the most costly one is credit card debt.____

    正确答案: F
    解析:
    由题目中出现的“essential debts”可定位到F段。文中与本句表达的意思相同,只不过原文中的“expensive”换成了此处的“costly”,故匹配段落为F段。

  • 第21题:

    单选题
    A customer is deploying a wireless core feature set using autonomous access points and requires Layer 2 roaming. What is a requirement when deploying this solution?()
    A

     a minimum of one Cisco 4100 Series WLAN Controller

    B

     one WDS per subnet

    C

     a minimum of one Wireless LAN Services Module

    D

     all clients using Cisco Aironet Wireless LAN Adapters


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()
    A

    One processor card and one GX+ expansion card

    B

    Two processor cards and one GX++ expansion card

    C

    One processor card, one GX+ expansion card, and one GX++ expansion card

    D

    Two processor cards, one GX+ expansion card, and one GX++ expansion card


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()
    A

    Install the two cards in slots 5 and 6 in the x445.

    B

    Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.

    C

    Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.

    D

    Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.


    正确答案: A
    解析: 暂无解析