The new system requires 1 installed processor card for the GX++ bus adapter
The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
第1题:
Which of the following is MOST critical when installing a new processor in an existing system?()
第2题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第3题:
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()
第4题:
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
第5题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第6题:
e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第7题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第8题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第9题:
Configure the PCIe SSD adapter and drive modules as a JBOD
Configure a pair of mirrored PCIe SSD adapters and drive modules
Configure the PCIe SSD adapter and drive modules in a RAID-6 array
Configure the PCIe SSD adapter and drive modules in a RAID-5 array
第10题:
Order a new HMC to support the p5 system.
Attach the new p5 system to the existing HMC.
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HMC.
第11题:
Metro Mirror
FlashCopy
Global Mirror
Snapshot
第12题:
IBM eConfig
IBM Performance Monitor
IBM Workload Estimator (WLE)
IBM System Planning Tool (SPT)
第13题:
A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()
第14题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第15题:
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
第16题:
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
第17题:
logical configuration
all configuration
full state
system configuration
第18题:
The monitor cannot display the increased resolution that is a feature of the new graphics card.
The power supply does not provide enough wattage to power the new graphics card.
The new graphics card is incompatible with the existing processor.
The computer does not have enough RAM to support the new graphics card.
第19题:
The new system requires 1 installed processor card for the GX++ bus adapter
The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
第20题:
p630. Maximum partitions, maximum storage, I/O bus speed
p670. Maximum partitions, maximum memory, number of I/O slots
p655. Maximum number of CPUs, processor speed, number of I/O slots
p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth
第21题:
Power 710
Power 720
Power 730
Power 740
第22题:
Thermal paste
Fans
Drive speeds
Cable management
第23题:
Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the cluster
Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.
Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original cluster
Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster
第24题:
One processor card and one GX+ expansion card
Two processor cards and one GX++ expansion card
One processor card, one GX+ expansion card, and one GX++ expansion card
Two processor cards, one GX+ expansion card, and one GX++ expansion card