问题:单选题Which of the following functions can be performed using the Integrated Virtualization Manager?()A Concurrent firmware updatesB Management of virtual storageC Hot add/remove of I/O drawersD Management of Capacity on Demand...
查看答案
问题:单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 fi...
问题:单选题Which of the following uses compression/decompression to increase the memory available for client workloads?()A PowerVMB VMControlC Active Memory SharingD Active Memory Expansion...
问题:单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A 4B 8C 16D 32...
问题:单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard E...
问题:单选题A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, in...
问题:单选题Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()A DS6800B DS8100C DS8300D XIV Storage System...
问题:单选题Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()A Removes the requirement for Intelligent PDUsB Monitor and balance disk speeds according to utiliz...
问题:单选题A BladeCenter S chassis with 2 storage modules requires how many power supplies?()A 1B 2C 4D 6...
问题:单选题A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()A T...
问题:单选题A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s whic...
问题:单选题A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing lim...
问题:单选题A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A Configure 2 CFFh combination fibre channel / gigabit Ethernet adapter...
问题:单选题A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ...
问题:单选题What is an advantage of using an HMC rather than IVM for system management?()A Support for a single VIO Server environmentB Adapters can be dedicated or virtual for each LPAR environmentC Interfaces with Systems Director to manage the Power Systems ser...
问题:单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potentia...
问题:单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable...
问题:单选题Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()A Redundant system clocksB Redundant service processorsC eDRAM chips have redundant L3 cacheD Main memory DIMMs contain a redundant DR...
问题:单选题A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address th...