Reserve Capacity on Demand
Utility Capacity on Demand
Capacity Upgrade on Demand
Uncapped Capacity on Demand
第1题:
A server needs to have memory added to support a new application. It currently is using PC4200 in a single channel configuration. Which of the following would be the correct memory upgrade?()
第2题:
Company.com has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?()
第3题:
A mainframe customer wants to add additional disk capacity to an IBM System Storage DS8100to accommodate a projected workload increase. They ask the storage specialist to assess theimpact of the additional capacity on the DS8100 without other upgrades. Which tool bestassesses the impact of the upgrade on response times?()
第4题:
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()
第5题:
A customer is considering a second p690 at a second site for Disaster Recovery purposes. Which of the following On Demand offerings is most applicable in this environment?()
第6题:
A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center. Which solution best meets the customer’s requirements()
第7题:
Change to a 4-way p5-550
Use Capacity on Demand
Configure a fourth logical partition
Add memory to the configuration
第8题:
Install larger capacity PC2100 dual channel memory modules.
Add a PCI expansion card with PC2100 single channel memory modules.
Install smaller capacity PC4200 single channel memory modules.
Install larger capacity PC4200 single channel memory modules.
第9题:
Add CPU and memory COD so they have room to grow if required
Make the server configuration twice as large as the current requirement
Configure the server for the current capacity requirements
Make the server configuration a little larger than the current capacity requirements
第10题:
Loadleveler
AIX Workload Manager
Partition Load Manager
Tivoli Provisioning Manager
第11题:
HMC command line
Uncapped processors
Partition Load Manager
Enterprise Workload Manager
第12题:
DS8800 system with three frames
DS8800 system with one frame
DS8700 system with two frames
DS8800 system with two frames
第13题:
A customer would like to share the processor resources automatically between logical partitions. Which of the following would accomplish this requirement without user interaction? ()
第14题:
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()
第15题:
Company.com is ordering a new p5-570 and planning for the option of using Capacity on Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()
第16题:
A customer is interested in PS700 Blade with 32GB of memory. The Blade will have 4 partitions sharing resources equally. They want the least expensive operating system that supports Live Partition Mobility. Which of the following AIX Editions address their requirement?()
第17题:
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()
第18题:
Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()
第19题:
Basic
Express
Standard
Enterprise
第20题:
What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第21题:
Reserve Capacity on Demand
Utility Capacity on Demand
Capacity Upgrade on Demand
Uncapped Capacity on Demand
第22题:
Configure AIX Workload Manager
Configure Partition Load Manager
Configure eServer Workload Manager
Use DLPAR from the HMC
第23题:
Dynamic LPARs
On/Off Capacity on Demand
Uncapped Micro-Partitioning
Enterprise Workload Manager