当前分类: SK0-002
问题:单选题What is a reason for reviewing the user requirements document with the client?()A To gain the client’s acceptance of the detailed designB To verify mutual understanding of project resourcesC To verify mutual understanding of the detailed project planD ...
查看答案
问题:单选题Why does a project manager need an executive sponsor?()A To keep the project team focused on its workB To provide behind-the-scenes assistance with organizational commitment and supportC To sign-off on user requirementsD To negotiate contracts with out...
问题:单选题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()A replace the NICB install the latest SSU (System Setup...
问题:单选题Which throughput does a 33 MHz, 33-bit bus have?()A 132 MbpsB 256 MbpsC 264 MbpsD 450 Mbps...
问题:单选题Which RAID standard combines data striping across drives with mirroring?()A RAID 0+1B RAID 1+5C RAID 3D Hybrid RAID 5+...
问题:多选题A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hub...
问题:单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A by written and oral communication.B via a weekly status report.C through the formal chain of command.D with approved t...
问题:单选题Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()A Developing key personnelB Leading technical specialistsC...
问题:单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A Historical informationB Use of outside vendorsC Change control processesD Human resource skill level requirements...
问题:单选题What is the MOST accurate way to determine a project’s duration before execution?()A The project manager performs all estimatesB Incorporate each individual worker’s estimatesC Acquire expert estimatesD There is no way to determine the duration...
问题:单选题After upgrading the SNMP (Simple Network Management Protocol) protocol, the ()can be looked up. It is a sequence of integers that uniquely identifies a path to a managed object.A MIB (Management Information Base)B OID (ObjectIDentifier)C registerD ...
问题:单选题The last deliverable at the Close Out meeting is:()A source code.B passwords.C lessons learned.D test results....
问题:单选题A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. Th...
问题:单选题Who is responsible for authorizing closure of the project?()A Project ManagerB StakeholderC CustomerD Executive Sponsor...
问题:单选题The SOW (Statement of Work) is another name for the:()A WBS (Work Breakdown Structure).B cost benefit analysis.C requirements specifications.D narrative description of the work to be accomplished....