当前分类: IBM(000-151)
问题:单选题A customer wants to update their system with the latest drivers. Which tools would you suggest of the following?()A Bootable Media CreatorB Advanced Settings UtilityC Update Express System Pack InstallerD ServerGuide Scripting Toolkit...
查看答案
问题:单选题Which is the packaging strategy of iDataPlex of the following?()A Fourteen servers per rack likeBladeCenterB Two servers per rack for optimal cooling costC One server per rack for optimal cooling and energy efficiencyD Four servers per rack (twoexach h...
问题:单选题A System x client is interested in IBM ToolsCenter Bootable Media Creator but is concerned about functions Which describes the functions of ToolsCenter Bootable Media of the following?()A Updatefirmware, update drivers, run diagnostics, install Windows...
问题:单选题A customer is looking at an Oracle E-Business solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Whic...
问题:单选题A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()A Usable densityB Lowest cost of acquisitionC Flexible configurations ready for integration and testing at the customer locationD Standard r...
问题:单选题A retail customer has a database application that is accessed by a large number of people through a web interface from multiple remote locations. Which questions will provide the information necessary to design the best performing storage solution of t...
问题:单选题A customer is considering a DS3500 to replace an installed DS3400. Which is a supporting reason for this change of the following?()A A total of 48 drives are requiredB iSCSI and FC are needed in the same unitsC Remote mirroring is requiredD Must attach...
问题:单选题A healthcare and life sciences client wants to maintain electronic patient records, including medical images, for two years after each patient’s death. How would the IT storage industry describe this business goal?()A Archive solution that requires eve...
问题:单选题A customer plans to deploy Open Fabric Manager (OFM). Which vendors meet this need of the following?()A BrocadeB Blade Network Technology (BNT)C CiscoD Juniper...
问题:单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redunda...
问题:单选题An installed customer has developed human resource constraints in the IT department. Which of the following allows the sales professional to proceed with future sales?()A Proof of conceptB Volume sales discountsC ServicePacsD Industry leading technolog...
问题:单选题A prospective client needs to combine Ethernet, FCOE, and iSCSI.They have not been able to practically combine these in the past.Which IBM products meets this need of the following?()A BladeCenter Open Fabric Manager (BOFM)B SAN Volume Controller (SVC)...
问题:单选题A business partner wants to identify risks, develop action plans to manage the risks, and confirm resources required for a successful implementation of a BladeCenter solution to their customer. Which addresses this situation of the following?()A Conduc...
问题:单选题Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()A PowerExecutiveB Active Energy Manager (AEM)C Tivoli Provisioning Manager (TPM)D Energy Monitoring and Control (EMC)...
问题:单选题The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life...
问题:单选题A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following m...
问题:单选题An eX5 client is concerned about the cost-per-GB of the proposed SAS disk-based solution, and suggests using SATA disk technology in order to reduce costs for their 24x7 mission-critical Microsoft SQL Server application. Which addresses the customer is...
问题:单选题In which phase should a TDA be performed of the following?()A Server deploymentB Installation and server configurationC Problem determination / resolutionD Needs analysis and design...