Select the Server Proven configuration for Oracle E-Business
UseeConfig to configure a Power server with AIX to support Oracle E-Business applications
Download the Oracle E-Business sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing
Use SSCT to configure a system that meets the minimum requirements specified by Oracle E-Business
第1题:
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第2题:
You have a junior sales representative working with your largest customer, who needs to build an entry System x Server hardware solution. Which IBM resource should the junior sales representative use? ()
第3题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第4题:
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()
第5题:
A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center. Which solution best meets the customer’s requirements()
第6题:
You have been tasked with creating Business Events for an E-Business Suite workflow project. Whatwould you use to create your Business Events?()
第7题:
Configure a 2 node x3950 X5
Customer needs a System p server to support Oracle applications
Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing
Configure a system that meets the minimum requirements
第8题:
Direct the customer to the Installation Guide for each system to identify the power requirements.
Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
第9题:
IBM ServerProven hardware website
IEEE Proven website
IBM PartnerWorld website
3Com Support website
第10题:
CDAT
Configuration and Options Guide (COG)
Physical Alarm Sounding in Data Center
IBM Systems Director
第11题:
ITSO Redbooks
Facts and Features
System Planning Tool
Fix Level Recommendation Tool
第12题:
x3650 M3 servers and racks
x3550 M3 servers, VMware and racks
BladeCenter, blades and VMware
x3620 M3 servers and VMware
第13题:
You have successfully sold and installed your customer’s System x solution. Sometimes, the overall succeed of a sale depends on how well you have trained your customer to support their new hardware. Please consider the following tools. Which one would be the best for protectively determining a server outage, and contacting the system administrator about the outage?()
第14题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第15题:
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第16题:
A customer is looking at an Oracle E-Business solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第17题:
An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()
第18题:
xSeries specialist,as the customer may have some Intel-based systems.
Hardware customer engineer,as they will be installing the entire solution.
Services specialist,as they can provide education recommendations for the entire solution.
Storage specialist,as the customer may need disk to store the data and tape to backup the data.
第19题:
Oracle Scheduler would write detailed information to the job log for each run of each job in the job class.
Oracle Scheduler would write detailed information to the job log for the first run of each job in the job class.
Oracle Scheduler would write detailed information to the job log for each run of only the first job in the job class.
Oracle Scheduler would write detailed information for all operations performed on all jobs in the job class.
第20题:
System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
第21题:
IBM Sizing Guides
IBM System x and BladeCenter Business Partner Guidebook
IBM Standalone Solutions Configuration Tool (SSCT)
IBM ServerProven
第22题:
Send the customer information on VMware
Send the customer information on IBM BladeCenter
Call the customer to ask why they are consolidating
Send the customer information on IBM System P
第23题:
DS8800 system with three frames
DS8800 system with one frame
DS8700 system with two frames
DS8800 system with two frames