问题:单选题A customer wants to update their system with the latest drivers. Which tools would you suggest of the following?()A Bootable Media CreatorB Advanced Settings UtilityC Update Express System Pack InstallerD ServerGuide Scripting Toolkit...
查看答案
问题:单选题Which is the packaging strategy of iDataPlex of the following?()A Fourteen servers per rack likeBladeCenterB Two servers per rack for optimal cooling costC One server per rack for optimal cooling and energy efficiencyD Four servers per rack (twoexach h...
问题:单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redunda...
问题:单选题A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following m...
问题:单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provis...
问题:单选题A customer is concerned that the Windows server virtualization solution discussed with them seems to be too leading edge. They are not comfortable with new technology. What information could be supplied to provide industry trends and directions of the ...
问题:单选题A prospective client needs to combine Ethernet, FCOE, and iSCSI.They have not been able to practically combine these in the past.Which IBM products meets this need of the following?()A BladeCenter Open Fabric Manager (BOFM)B SAN Volume Controller (SVC)...
问题:单选题A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()A Usable densityB Lowest cost of acquisitionC Flexible configurations ready for integration and testing at the customer locationD Standard r...
问题:单选题A System x administrator is considering new storage subsystems. Which is a benefit of SAS over Solid State of the following?()A Higher transfer speedsB Increased power consumption with Solid StateC Increased bandwidthD Cost per MB...
问题:单选题Selling the total solution includes adding services and financing options which ensures your customer will remain satisfied with their purchase. Which of the following best describes the benefits of Selling options, storage, services, and financing to ...
问题:单选题A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Whic...
问题:单选题Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()A PowerExecutiveB Active Energy Manager (AEM)C Tivoli Provisioning Manager (TPM)D Energy Monitoring and Control (EMC)...
问题:单选题A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discusse...
问题:单选题In which phase should a TDA be performed of the following?()A Server deploymentB Installation and server configurationC Problem determination / resolutionD Needs analysis and design...
问题:单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A Support for10Gb internal networkB Support for SSDC Support for integrated disk drivesD Support for8Gb FC Switch Modules...
问题:单选题A customer asks which bays they could install Multi-Switch Interconnect Module (MSIM). Which is the source of this information of the following?()A CDATB IBM Systems DirectorC Tivoli Provisioning Manager (TPM)D xREF...
问题:单选题A customer asks the sales professional how to update the UEFI on the HX5. They do not want to use AMM. Which is the procedure of the following?()A InstallServerGuide CD/DVD,boot the HX5 blade and follow the promptsB Boot the blade from the HX5 Bootable...