当前分类: IBM(000-151)
问题:单选题A customer is looking at an Oracle E-Business solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Whic...
查看答案
问题:单选题A retail customer has a database application that is accessed by a large number of people through a web interface from multiple remote locations. Which questions will provide the information necessary to design the best performing storage solution of t...
问题:单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum am...
问题:单选题In which phase should a TDA be performed of the following?()A Server deploymentB Installation and server configurationC Problem determination / resolutionD Needs analysis and design...
问题:单选题Which of the following is a management strategy of iDataPlex?()A IBM Systems Director manages all components as single imageB Rack Management Appliance manages the homogeneous imageC HMC manages dissimilar componentsD Tivoli Provisioning Manager (TPC) ...
问题:单选题Which is the packaging strategy of iDataPlex of the following?()A Fourteen servers per rack likeBladeCenterB Two servers per rack for optimal cooling costC One server per rack for optimal cooling and energy efficiencyD Four servers per rack (twoexach h...
问题:单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provis...
问题:单选题A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()A Usable densityB Lowest cost of acquisitionC Flexible configurations ready for integration and testing at the customer locationD Standard r...
问题:单选题An eX5 client is concerned about the cost-per-GB of the proposed SAS disk-based solution, and suggests using SATA disk technology in order to reduce costs for their 24x7 mission-critical Microsoft SQL Server application. Which addresses the customer is...
问题:单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the followin...
问题:单选题The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life...
问题:单选题A client’s CIO validates that IBM proposed virtualization/consolidation solution addresses their key pain points. However, the CFO is more concerned with risk mitigation as a result of the new economic environment and has delayed the deal indefinitely....
问题:单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to ...
问题:单选题A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A A solution sizing questionnaireB Verify the customer h...
问题:单选题A customer has Direct Attached Storage (DAS) storage for their Windows servers. They are allocating money in next year’s budget for additional storage. Which of the following questions should be asked first to determine the proper storage solution to p...