单选题A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following m

题目
单选题
A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()
A

Two additional power supplies

B

Fibre Channel (FC) switches and SAN storage

C

A Nortel 1/10 GB ESM

D

SSD for the HX5


相似考题
更多“单选题A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following m”相关问题
  • 第1题:

    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()

    • A、6
    • B、8
    • C、10
    • D、12

    正确答案:C

  • 第2题:

    A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()

    • A、iDataPlex with vSphere
    • B、Four x3550 M3 servers,vSphere and racks
    • C、BladeCenter, HX5 blades and vSphere
    • D、One x3950 X5 servers andvSphere

    正确答案:C

  • 第3题:

    A customer has purchased an IBM BladeCenter H chassis and needs the following servers:  --Two HS21 blade servers each with 8GB memory and 2 drives   --Two HS21 blade servers each with 24GB memory and 2 drives   --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives   How many total server bays will be required for this configuration?()

    • A、6
    • B、8
    • C、10
    • D、12

    正确答案:C

  • 第4题:

    A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()

    • A、32U 
    • B、25U 
    • C、22U 
    • D、21U

    正确答案:B

  • 第5题:

    A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()

    • A、Two additional power supplies
    • B、Fibre Channel (FC) switches and SAN storage
    • C、A Nortel 1/10 GB ESM
    • D、SSD for the HX5

    正确答案:A

  • 第6题:

    单选题
    A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()
    A

    32U

    B

    21U

    C

    25U

    D

    22U


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()
    A

    Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules

    B

    Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules

    C

    Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules

    D

    Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has purchased an IBM BladeCenter H chassis and needs the following servers:  --Two HS21 blade servers each with 8GB memory and 2 drives   --Two HS21 blade servers each with 24GB memory and 2 drives   --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives   How many total server bays will be required for this configuration?()
    A

    6

    B

    8

    C

    10

    D

    12


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()
    A

    32U 

    B

    25U 

    C

    22U 

    D

    21U


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
    A

    12 

    B

    10 

    C

    8 

    D

    6


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()
    A

    iDataPlex with vSphere

    B

    Four x3550 M3 servers,vSphere and racks

    C

    BladeCenter, HX5 blades and vSphere

    D

    One x3950 X5 servers andvSphere


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
    A

    One 50 GB SATA 1.8 inch SSD

    B

    Two 73GB 10K SAS HDD SFF

    C

    Two 31 GB SATA 2.5 inch SSD

    D

    Two 50GB SATA 1.8 inch SSD


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()

    • A、12 
    • B、10 
    • C、8 
    • D、6

    正确答案:B

  • 第14题:

    A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()

    • A、Did you add the redundant AMM?
    • B、What is the processor wattage?
    • C、Is the AMM firmware up to date?
    • D、Is the HS22V memory configuration optimized?

    正确答案:C

  • 第15题:

    A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()

    • A、One 50 GB SATA 1.8 inch SSD
    • B、Two 73GB 10K SAS HDD SFF
    • C、Two 31 GB SATA 2.5 inch SSD
    • D、Two 50GB SATA 1.8 inch SSD

    正确答案:C

  • 第16题:

    A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()

    • A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
    • B、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
    • C、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
    • D、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules

    正确答案:D

  • 第17题:

    A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H.  What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()

    • A、SAN Switch modules
    • B、Blowers
    • C、Power supplies
    • D、Battery backup units

    正确答案:A

  • 第18题:

    单选题
    A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()
    A

    Two additional power supplies

    B

    Fibre Channel (FC) switches and SAN storage

    C

    A Nortel 1/10 GB ESM

    D

    SSD for the HX5


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
    A

    The Blades must use the same CIOv and CFFh expansion adapter types.

    B

    Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86  Blades.

    C

    The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades  are in bays 1-7 and the x86 Blades are in slots 8-14.

    D

    The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()
    A

    Support for10Gb internal network

    B

    Support for SSD

    C

    Support for integrated disk drives

    D

    Support for8Gb FC Switch Modules


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()
    A

    6

    B

    8

    C

    10

    D

    12


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()
    A

    4

    B

    3

    C

    2

    D

    8


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()
    A

    The room temperature has reached 23C (73.4F). 

    B

    A Blade within the chassis has been shut down. 

    C

    The ambient temperature in the data center has increased 

    D

    One of the additional System X servers in the BladeCenter rack has failed.


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H.  What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
    A

    SAN Switch modules

    B

    Blowers

    C

    Power supplies

    D

    Battery backup units


    正确答案: C
    解析: 暂无解析