Superior chip density
Balance performance, cost, and power and cooling efficiency
Flexible configurations ready for integration and testing at the customer location
Standard rack mounting
第1题:
Which of the following is the MOST important physical consideration when deploying a new server?()
第2题:
A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()
第3题:
When selling against competition, which of the following focus on the iDataPlex value proposition? ()
第4题:
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
第5题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第6题:
When selling against competition, which of the following focus on the iDataPlex value proposition?()
第7题:
Implementing CoD
Using Express Configurations with processor upgrades
Meeting the minimum Value Pak rules
Engaging the pSeries representative to identify appropriate discounts
第8题:
Large selection of proven applications
Standard rack mounting
Flexible configurations ready for integration and testing at the customers data center
Easy maintenance through individual hot-swappable nodes
第9题:
Usable density
Lowest cost of acquisition
Flexible configurations ready for integration and testing at the customer location
Standard rack mounting
第10题:
Humidity monitors, Biometrics, and fire suppression
Cooling, rack space, and power requirements冷
Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV
Biometrics, fire suppression, and power requirements
第11题:
The source of cooling to a RAID system
The cooling system in a redundant power supply
A cooling system that can be installed in case of failure
A second cooling system in case of a failure
第12题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第13题:
Which of the following is the MOST important physical consideration when deploying a new server?()
第14题:
A customer is considering iDataPlex and several competitive solutions. Which of the following favor iDataPlex?()
第15题:
Which is the packaging strategy of iDataPlex of the following?()
第16题:
Which of the following is an advantage of the IBM System Storage SAN Volume Controller overcompeting storage virtualization products?()
第17题:
When selling against competition, which focus on the iDataPlex value proposition of the following?()
第18题:
Epoxy paste
Chip fan
Heat sink
Virtualization
第19题:
Lowest cost of acquisition
Useable density
Flexible configurations ready for integration and testing at the customers data center
Standard rack mounting
第20题:
Superior chip density
Balance performance, cost, and power and cooling efficiency
Flexible configurations ready for integration and testing at the customer location
Standard rack mounting
第21题:
Superior chip density
Balance performance, cost, and power+cooling efficiency
Flexible configurations ready for integration and testing at the customers data center
Standard rack mounting
第22题:
Acquisition cost, speed and density
High performance processors, cooling and reliability
Power, cooling and density
Acquisition cost, density and reliability
第23题:
DDR without ECC
DDR with ECC
SDRAM without ECC
SDRAM with ECC
第24题:
Fourteen servers per rack likeBladeCenter
Two servers per rack for optimal cooling cost
One server per rack for optimal cooling and energy efficiency
Four servers per rack (twoexach half high) for optimal cooling