当前分类: IBM(000-062)
问题:单选题Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()A HMC command l...
查看答案
问题:单选题Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the to...
问题:单选题A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent. What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()A Reboot the source LPAR.B Remove the resour...
问题:单选题ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical...
问题:单选题Company.com wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?()A VLANB Virtual EthernetC Virtual I/O Serve...
问题:单选题A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concer...
问题:单选题Company.com with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing th...
问题:单选题When doing capacity planning for the Virtual I/O Server,what is the most important consideration?()A The I/O workload needs of the client LPARsB The processing requirements of the client LPARsC The memory requirements of the client LPARsD The virtual ...
问题:单选题Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of ...
问题:单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool....
问题:单选题Which of the following allows the user to have two separate Ethernet networks share the same network adapter?()A VLAN tagsB EtherChannelC Virtual EthernetD Shared Ethernet Adapter...
问题:单选题A technical specialist defined a virtual Ethernet ent2 on the VIO server that has a physical adapter, ent0. Which of the following commands should be used to configure the Shared Ethernet Adapter?()A mkvdev -sea ent2 -vadapter ent0 -default ent0 -def...
问题:单选题A hosting company recently purchased an IBM p5-570 to use in their data center. The company intends to use the server to run several different client workloads. Which of the following features of the IBM p5 servers addresses the need for the isolation ...
问题:单选题Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()A Two HBAs assigned to each redundant VIOS which provides VSCSI access...
问题:单选题The Information Technology (IT) department wants to consolidate two 4-way p5-550 servers onto an 8-way p5-570. However, the departments using the p5-550 servers are concerned about quality of service after consolidation. Which per-partition processor a...
问题:单选题Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()A Connect to the network,power on the server,Micro-Partition the serverB Connect to the HMC...
问题:单选题Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()A Co...