Order a POWER5 HMC
Connect to the existing HMC
Install an 8-port asynchronous card in the managed server to connect to the existing HMC
Install an additional network card to the existing HMC and connect to the POWER5 service processor
第1题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第2题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第3题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第4题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第5题:
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()
第6题:
An additional switch for the new HMC
Asynchronous adapters on the new HMC
The two 570 servers are directly connected to the new HMC
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第7题:
The technical support specialist has completed a UNIX course at college.
The technical specialist has supported several similar projects and has earned an IBM AIX certification.
The technical support specialist’s company sells $3M of UNIX computer systems every year.
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
第8题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第9题:
Configure the IP address through the first client partition.
Configure the IP address through the ASMI menus.
Configure the POWER5 service processor for DHCP from the HMC DHCP server.
Configure the HMC to use the default IP address on the service processor when acquiring the managed server.
第10题:
Connect to the network,power on the server,Micro-Partition the server
Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
Power on server,connect to the network,Micro-Partition the server,connect to the HMC
Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
第11题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第12题:
An additional switch for the new HMc
Asynchronous adapters on the new HMc
The two 570 servers are directly connected to the new HMc
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
第13题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第14题:
The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()
第15题:
ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()
第16题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第17题:
Connect to the network,power on the server,Micro-Partition the server
Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
Power on server,connect to the network,Micro-Partition the server,connect to the HMC
Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
第18题:
Service Processor
Service Director
Inventory Scout Services
Service Focal Point
第19题:
Supportline
ServiceSuite
Software Maintenance Agreement (SWMA)
Machine Control Program Remote Support Agreement (MCPRSA)
第20题:
A DCE domain
A Kerberos domain
A PPP tunnel between the servers
An IPSEC tunnel between the servers
第21题:
Order a POWER5 HMC
Connect to the existing HMC
Install an 8-port asynchronous card in the managed server to connect to the existing HMC
Install an additional network card to the existing HMC and connect to the POWER5 service processor
第22题:
Order a new HMC to support the p5 system.
Attach the new p5 system to the existing HMC.
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HMC.
第23题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room