单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool.

题目
单选题
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()
A

Create all the partitions as AIX 5.2, each having two dedicated processors.

B

Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.

C

Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.

D

Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.


相似考题
参考答案和解析
正确答案: C
解析: 暂无解析
更多“单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool.”相关问题
  • 第1题:

    Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak.  What is the best configuration to fully utilize the processor resource?()

    • A、Set up the server in SMP mode and use WLM to manage resources effectively
    • B、Set up eight dedicated LPARs and use DLPAR to manage resources effectively
    • C、Set up a shared pool with eight capped LPARs including production and test/dev
    • D、Set up a shared pool with eight uncapped LPARs with priority weight to Production

    正确答案:D

  • 第2题:

    Company.com has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?()

    • A、Change to a 4-way p5-550
    • B、Use Capacity on Demand
    • C、Configure a fourth logical partition
    • D、Add memory to the configuration

    正确答案:A

  • 第3题:

    A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()

    • A、The p5-570 would save rack space over a pair of p5-550 servers.
    • B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.
    • C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.
    • D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.

    正确答案:B

  • 第4题:

    Company.com has purchased a 2-way p5-520 and would like to create three Micro-Partitions on the server. Which feature of Advanced POWER Virtualization would allow them to create the desired number of partitions?()

    • A、Virtual Ethernet
    • B、Shared Ethernet Adapter
    • C、Dedicated Processors
    • D、Shared Processor Pool

    正确答案:D

  • 第5题:

    Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()

    • A、Enable SMT
    • B、Reduce the weight
    • C、Renice the process
    • D、Increase the weight

    正确答案:D

  • 第6题:

    Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()

    • A、Dynamic LPAR
    • B、Workload Manager
    • C、Partition Load Manager
    • D、Shared Processor Pools

    正确答案:C

  • 第7题:

    单选题
    Companycom has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?()
    A

    A shared pool with four capped LPARs

    B

    A shared pool with four uncapped LPARs

    C

    Four dedicated LPARs and use DLPAR to manage resources effectively

    D

    The server in SMP mode and use WLM to manage resources effectively


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    Company.com has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?()
    A

    Change to a 4-way p5-550

    B

    Use Capacity on Demand

    C

    Configure a fourth logical partition

    D

    Add memory to the configuration


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation.  There is no manual method to perform the business process.  The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()
    A

    HACMP and four processors for the p5-570

    B

    HACMP and eight processors for the p5-570

    C

    HACMP-XD and a 4-way p5-570 in a second location

    D

    HACMP-XD and a 8-way p5-570 in a second location


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()
    A

    Create all the partitions as AIX 5.2, each having two dedicated processors.

    B

    Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.

    C

    Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.

    D

    Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()
    A

    The p5-570 would save rack space over a pair of p5-550 servers.

    B

    The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.

    C

    The p5-570 can only be upgraded to 64GB of RAM without replacing memory.

    D

    The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()
    A

    Enable SMT

    B

    Reduce the weight

    C

    Renice the process

    D

    Increase the weight


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()

    • A、p5-520 running Virtual I/O Server
    • B、p690 running AIX 5L V5.3
    • C、p5-510 running AIX 5L V5.2
    • D、p5-520 running two dedicated processor partitions

    正确答案:A

  • 第14题:

    Company.com wants to change the resource allocation for their AIX 5L V5.3 micro LPAR system. What is the smallest processor allocation than can be moved between partitions?()

    • A、A full processor
    • B、1% of a processor
    • C、10% of a processor
    • D、25% of a processor

    正确答案:B

  • 第15题:

    The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()

    • A、It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.
    • B、It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.
    • C、It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.
    • D、It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.

    正确答案:B

  • 第16题:

    A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()

    • A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2
    • B、p5-550 with the POWER5 processor technology and AIX 5.2
    • C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3
    • D、p5-570 with the POWER5 processor technology and AIX 5.2

    正确答案:D

  • 第17题:

    The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped. What is the most probable cause?()

    • A、The uncapped weight has been set to 0.
    • B、The uncapped weight has been set to 128.
    • C、The processing unit for that partition was set to .1 processing units. A full processor was  assigned.
    • D、The processing unit for that partition was set to 0.50 processing units. A full processor was assigned.

    正确答案:A

  • 第18题:

    单选题
    A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()
    A

    Allocate the HBA to a client partition.

    B

    Restart the Virtual I/O Server to detect the changes.

    C

    Install the device driver for the DS8000 in each of the four AIX partitions.

    D

    Allocate the HBA to the VIO server partition and install necessary drivers.


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped. What is the most probable cause?()
    A

    The uncapped weight has been set to 0.

    B

    The uncapped weight has been set to 128.

    C

    The processing unit for that partition was set to .1 processing units. A full processor was  assigned.

    D

    The processing unit for that partition was set to 0.50 processing units. A full processor was assigned.


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak.  What is the best configuration to fully utilize the processor resource?()
    A

    Set up the server in SMP mode and use WLM to manage resources effectively

    B

    Set up eight dedicated LPARs and use DLPAR to manage resources effectively

    C

    Set up a shared pool with eight capped LPARs including production and test/dev

    D

    Set up a shared pool with eight uncapped LPARs with priority weight to Production


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2.  Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()
    A

    7311-D20 drawer with four disks

    B

    Upgrade to AIX 5.3

    C

    Fiber adapters to attach to SAN

    D

    Nothing


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()
    A

    p5-520 running Virtual I/O Server

    B

    p690 running AIX 5L V5.3

    C

    p5-510 running AIX 5L V5.2

    D

    p5-520 running two dedicated processor partitions


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
    A

    Dynamic LPAR

    B

    Workload Manager

    C

    Partition Load Manager

    D

    Shared Processor Pools


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()
    A

    It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.

    B

    It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.

    C

    It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.

    D

    It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.


    正确答案: A
    解析: 暂无解析