Reboot the source LPAR.
Remove the resource from the source LPAR.
Rediscover the managed system from the HMC.
Add the resource to the profile of the LPAR.
第1题:
Company.com wants to reassign a host bus adapter (HBA) from one partition to another to handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()
第2题:
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()
第3题:
The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()
第4题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第5题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第6题:
Add the devices as virtual adapters to a VIO server first,then add the I/O drawer and create the shared ethernet adapters
Power down the partitions,run the diag a command when the system is brought back up and reconfigure the network cards
Use the rmdev command to remove the devices,shut down the partitions and move the cads,then run the cfgmgr command after reboot
Detach the network cards,run rmdev on the devices and then dynamically reassign theadapters to the partitions and reconfigure
第7题:
Business executives need to know how to generate customer loyalty.
Many executives believe more investment in customer loyalty means more profit.
It is necessary for companies to generate customer loyalty at all costs.
Customer loyalty will for sure help corporations make more money.
第8题:
Archive the materials in the team’s library.
Act as the sole technical resource for the team.
Summarize the information and make it available to the team.
Evaluate the class and recommend attendance to other team members.
第9题:
to study
study
studied
studying
第10题:
IBM Grid Toolbox
IBM Capacity on Demand
IBM Cluster Systems Management
IBM Global Solutions Directory
第11题:
Create a new direct role assignment.
Create a new management role assignment policy.
Create a new management scope.
Modify the default management scope.
第12题:
Use the rmdev command to remove the card from the current partition before doing the DLPAR process.
Take the source partition down and do the DLPAR function on the target partition.
Assign the card to the required section of the target partition and run cfgmgr.
Dynamically remove the card from the source and add to target profile then reactivate the target profile.
第13题:
Which IBM resource should be used to validate the results from a Disk Magic study PRIOR topresenting the final storage solution and pricing to a customer?()
第14题:
The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
第15题:
Your customer wants to make sure that there are not going to be compatibility issues between a third party HBA connecting to their non-IBM Storage device. What IBM resource would you start with to determine compatibility?()
第16题:
A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent. What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()
第17题:
Company.com is adding a new I/O drawer to an existing p5-570 with four LPARs and wants to re-balance the network cards in the I/O drawers. What is the best way to accomplish this?()
第18题:
xSeries specialist,as the customer may have some Intel-based systems.
Hardware customer engineer,as they will be installing the entire solution.
Services specialist,as they can provide education recommendations for the entire solution.
Storage specialist,as the customer may need disk to store the data and tape to backup the data.
第19题:
Service Processor
Service Director
Inventory Scout Services
Service Focal Point
第20题:
IBM Sizing Guides
IBM Configuration & Options Guide (COG)
IBM Standalone Solutions Configuration Tool (SSCT)
IBM ServerProven
第21题:
Why does your father want to stay in a hotel?
Is your father going abroad?
But do you know how to make a reservation?
How about calling the travel agency?
第22题:
Create all the partitions as AIX 5.2, each having two dedicated processors.
Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.
Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.
Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
第23题:
It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.
It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.
It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.
It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.