当前分类: IBM(000-238)
问题:单选题The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the intro...
查看答案
问题:单选题The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may lat...
问题:单选题A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IB...
问题:单选题A pSeries technical specialist is designing a p5-550 LPAR solution which will contain four logical partitions. Which tool should be used to ensure adherence to all partition rules?()A LVTB eSARC eConfigD PCRS6000...
问题:单选题A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best det...
问题:单选题A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should a...
问题:单选题The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()A Re...
问题:单选题A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer s...
问题:单选题During a presentation on the p5 machines, a customer asks the pSeries technical specialist a question regarding the differences between POWER4+ and POWER5. In addition to new advanced power management, SMT, and larger L2 and L3 caches in POWER5, which...
问题:单选题A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries tech...
问题:单选题A customer requires a 2-way solution now that will be the easiest and least disruptive to upgrade to a 4-way in the future. Which of the following solutions best matches these requirements?()A p630 2-way Active 2-way InactiveB p655 2-way Active 2-way ...
问题:单选题The pSeries technical specialist is discussing a proposed solution for a commercial application that contains the following options: p670, p690, and p5-570. The customer asks why a p655 was not considered as a solution. The customer’s requirements inc...
问题:单选题A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the...
问题:单选题A customer is looking for a low-cost pSeries solution. The pSeries technical specialist is recommending several p650 Express Configurations. When reviewing the options with the customer, the pSeries technical specialist should emphasize which of the ...
问题:单选题Which of the following is required to connect a partitioned p5-550 to a modem?()A A modem adapterB An async adapter and serial cableC An Ethernet adapterD A 9-pin to 25-pin converter and serial cable...
问题:单选题A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()A IBM TechlineB IBM SupportlineC IBM Software DistributionD IBM Hardware Supp...
问题:单选题A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and datab...
问题:单选题A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()A Is there a need for a PKI Management System?B I...