Offer to rebuild the logical volume for a fee.
Offer to talk the customer through the procedure to rebuild the logical volume for a fee.
Suggest the customer open a call with IBM TechLine; offer to explain how the process works.
Suggest the customer open a call with IBM SupportLine; offer to explain how the process works.
第1题:
A user reports that their hard drive has failed and needs to be replaced. Which of the following should the technician do FIRST?()
第2题:
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()
第3题:
A customer has purchased three IBM System Storage DS8300 systems and would like to have their SAN and storage administrator trained. The customer is worried about having much of their staff out of the office at the same time attending courses. Which training alternative provides the necessary training with the least impact()
第4题:
One of the mirrored disks for the root volume group has failed. Although the logical volumes are mirrored, and the bosboot command was run, the machine will not boot. What is the most probable cause?()
第5题:
During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed. What other topic should be discussed in this solution review()
第6题:
A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()
第7题:
Quorum was not turned off
Paging space was not mirrored
The dump space was not mirrored
The surviving disk was too small
第8题:
reducevg, rmdev, syncvg
rmlvcopy, exportvg, rmdev
rmlvcopy, reducevg, rmdev
No action is required since SSA is a Hot Swap device and is mirrored
第9题:
The 4X CD-ROM drive has dirty optics or laser and requires cleaning.
The 4X CD-ROM drive needs to be jumpered to support CD-RW disks.
The 4X CD-ROM drive does not support the multi-read specification.
The 4X CD-ROM is fine, but the CD-RW disk has a flaw in its format.
第10题:
Remove the physical volume from the system.
Remove the physical volume from the volume group.
Remove the physical partitions from the volume group.
Remove the logical volume copies from the failing drive.
第11题:
Recommend the customer call EMC.
Recommend the customer call IBM hardware support.
Recommend the customer contact SupportLine.
Recommend the customer re-creates the volume groups.
第12题:
Use lquerypv to read the drive
Use lspv and look at PP Size value
Look on the outside of the drive itself
Use bootinfo to find the LTG on the drive
第13题:
An SSA disk that is part of the mirrored volume group needs to be replaced. Which of the following procedures should be performed before the disk is physically able to be replaced?()
第14题:
A customer is experiencing problems with a failed disk drive on their newly purchased p630 server. The IBM CE has replaced the disk and now the mirrored Logical Volume needs to be re-created. The customer does not have the skills to do this. There is no support contract with the solution provider but the p630 is covered under a Software Maintenance Agreement (SWMA) 24/7 contract. What should the pSeries technical specialist do first?()
第15题:
A system administrator has determined a root mirrored disk, hdisk1, needs to be replaced. The root volume has been unmirrored. What is the next step to remove the disk drive?()
第16题:
A customer has purchased three IBM System Storage DS8700 systems and would like to have their administrators trained. Which training alternative provides the necessary training with the least financial impact()
第17题:
A system administrator’s daily monitoring has revealed a failing disk drive. The drive that is failing, hdisk0, is a lvm mirrored drive. What is the first step that should be taken in order to physically replace this drive?()
第18题:
purchase the training CD for the disk subsystem and have the staff do self-paced training
have the IBM Service Support Representative perform the training
contact IBM Education Services for an onsite training class
send one person at a time to an IBM training session
第19题:
Two disk drive sets of 300 GB drives
Four disk drive sets of 146 GB drives
Eight disk drive sets of 73 GB drives
Nine disk drive sets of 146 GB drives
第20题:
Offer to rebuild the logical volume for a fee.
Offer to talk the customer through the procedure to rebuild the logical volume for a fee.
Suggest the customer open a call with IBM TechLine; offer to explain how the process works.
Suggest the customer open a call with IBM SupportLine; offer to explain how the process works.
第21题:
purchase the training CD for the disk subsystem and have the staff do self-paced training
have the IBM Service Support Representative perform the training
contact IBM Education Services for an onsite training class
send one person at a time to an IBM training session
第22题:
Run the hard disk manufacturer’s diagnostic program
Re-image the drive
Replace the hard drive and load Windows
Ask the user diagnostic questions
第23题:
cfgmgr
rmdev -d hdisk1 -l
reducevg rootvg hdisk1
have the IBM CE replace the disk
第24题:
chvg
rmdev
reducevg
exportvg