当前分类: IBM(000-238)
问题:单选题A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solut...
查看答案
问题:单选题A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should a...
问题:单选题The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should t...
问题:单选题The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuratio...
问题:单选题A pSeries technical specialist is configuring the network adapters for an HACMP cluster. The plan is to use a four-port Ethernet adapter with IPAT via IP aliasing for the two service IP labels. Which of the following would be a critical concern with ...
问题:单选题What is the minimum number of p5-570 building blocks required to support 16 RIO drawers?()A 1B 2C 3D 4...
问题:单选题The pSeries technical specialist is discussing a proposed solution for a commercial application that contains the following options: p670, p690, and p5-570. The customer asks why a p655 was not considered as a solution. The customer’s requirements inc...
问题:单选题A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()A MRPDPlus toolB Inventory ServicesC PCRS6000 Portable ConfiguratorD eConfig - IBM Configurat...
问题:单选题Which of the following lists of items all require an HMC to function with POWER5?()A Running AIX 5.3 Implementing HACMP Implementing Static LPARB Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawersC Implementing VIO Server Im...
问题:单选题A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that ...
问题:单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A POWER5 supports multiple operating systems.B POWER5 supports more nodes in a clustered environment.C POWER5 hypervisor has significantly less overhead than hardwa...
问题:单选题A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the da...
问题:单选题A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution...
问题:单选题A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical spec...
问题:单选题What is the minimum number of virtual I/O server partitions needed to ensure high availability of the disks when utilizing the Virtual I/O server in a micro-partitioned solution?()A 1B 2C 3D 4...
问题:单选题Which of the following is the most cost effective required solution to support the boot disks internally for two partitions on a p5-520 running AIX 5.3 without the Advanced Virtualization feature?()A Optional 4-packB 7311-D20 RIO drawerC Optional 4-pac...
问题:单选题When should Solutions Assurance Reviews take place?()A Pre-order, pre-installationB Post-order, pre-installationC Pre-order, post completion sign-offD Pre-installation, post completion sign-off...
问题:单选题What is the main reason for doing a Solutions Assurance Review with the customer? ()A To revalidate the total solutionB To overcome objections to the solutionC To review the pricing with the customerD To ensure the customer has the correct applications...