当前分类: IBM(000-238)
问题:单选题A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solut...
查看答案
问题:单选题The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should t...
问题:单选题What is the minimum number of p5-570 building blocks required to support 16 RIO drawers?()A 1B 2C 3D 4...
问题:单选题Which of the following lists of items all require an HMC to function with POWER5?()A Running AIX 5.3 Implementing HACMP Implementing Static LPARB Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawersC Implementing VIO Server Im...
问题:单选题A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that ...
问题:单选题A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the da...
问题:单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A POWER5 supports multiple operating systems.B POWER5 supports more nodes in a clustered environment.C POWER5 hypervisor has significantly less overhead than hardwa...
问题:单选题Which of the following is the most cost effective required solution to support the boot disks internally for two partitions on a p5-520 running AIX 5.3 without the Advanced Virtualization feature?()A Optional 4-packB 7311-D20 RIO drawerC Optional 4-pac...
问题:单选题A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical spec...
问题:单选题Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?(...
问题:单选题What is the main reason for doing a Solutions Assurance Review with the customer? ()A To revalidate the total solutionB To overcome objections to the solutionC To review the pricing with the customerD To ensure the customer has the correct applications...
问题:单选题A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()A Is there a need for a PKI Management System?B I...
问题:单选题A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark). They like the idea of being able to do SAN maintenanc...
问题:单选题A p5-550 with AIX 5.3 is being designed for availability. In addition to providing redundant adapters, which of the following should also be provided?()A Redundant processor pools, UPS, and HACMPB Redundant service processors, HACMP, and mirrored AIX d...
问题:单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A The technical support spe...
问题:单选题A customer is ready to order a pSeries solution. However, the pSeries technical specialist is unsure whether the customer preferred the fibre channel or the external SCSI disk attachment option. What is the most appropriate action for the specialist ...
问题:单选题A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()A MRPDPlus toolB Inventory ServicesC PCRS6000 Portable ConfiguratorD eConfig - IBM Configurat...
问题:单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()A A des...