rmdev -Rdl fcs0
rmdev -cdl fcs0
rmdev -cdl fscsi0
rmdev -Rdl fscsi0
第1题:
A Fibre Channel fabric (or Fibre Channel switched fabric, FC-SW) is a switched fabric of Fibre Channel devices enabled by a Fibre Channel switch. Fabrics are normally subdivided by Fibre Channel zoning.Each fabric has a name server and provides other services. Higher redundancy over FC-AL, P2P.Which path selection protocol is used by Fibre Channel fabrics?()
第2题:
A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()
第3题:
Which two statements about QoS options in a Cisco UCS environment are true?()
第4题:
A server is configured with two network cards. To utilize the bandwidth of both network cards at the same time without assigning more than one IP address, which of the following load balancing techniques should be used?()
第5题:
A customer has purchased a triple channel memory kit containing three DDR3 RAM modules. Theserver the RAM is intended for only has a dual channel capable motherboard. Which of the following is the BEST action to perform?()
第6题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues. To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()
第7题:
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be used. Which solution best meets the specified requirements()
第8题:
An industrial sector customer has requested an IBM System x3755 for a high performance computing application. Pricing is the most sensitive decision factor for this customer. They are looking for an entry-level storage solution because the application needs to access about 12 TB of data, with an expected future growth of 10-15 percent. As this is the only server accessing this amount of data, the customer does not want to have a SAN. What should the System x Sales Specialist recommend? ()
第9题:
four
eight
sixteen
thirty-two
第10题:
Only to Cisco Fibre Channel switches
Only to Cisco Fibre Channel switches in NPIV mode
To any Fibre Channel switch
Directly to storage arrays
Only to Nexus Switches
第11题:
The ONS 15216 OADM can be provisioned to add/drop one, two, or four channels via Cisco Transport Manager (CTM).
The ONS 15216 OADM consists only of a four-channel module, and the number of ports utilized determines whether it is a one, two, or four channel OADM.
Three separate OADM modules are available for one, two, and four channels. The wavelengths to be dropped and added are programmable via Cisco Transport Manager (CTM).
The ONS 15216 OADM consists only of a single-channel module. Two-channel and four-channel support is available by stacking the single-channel module.
The ONS 15216 OADM is available in one, two, four channels. There are 32 single-channel OADM modules, 16 two-channel OADM modules, and 8 four-channel OADM modules.
第12题:
Change the IDE adapter from desired to required in partition two and restart the partition to release the resource.
Purchase a SCSI DVD-ROM drive to connect to the SCSI adapter in partition two.
Purchase an LTO tape drive so that a system image backup can be created to install a new AIX partition.
Change the IDE adapter from required to desired in partition one and restart the partition to release the resource.
第13题:
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()
第14题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第15题:
When configuring unified ports on a 5548 switch, which port ordering must be respected?()
第16题:
A server is configured with two network cards. To utilize the band width of both network cards at the same time without assigning more than one IP address,which of the following load balancing techniques should be used?()
第17题:
A system has two configured fibre channel cards, one of which, fsc0, has failed and must be replaced. Which command should an administrator use to remove the card device and attached child devices?()
第18题:
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
第19题:
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()
第20题:
OSPF
RIP
FSPF
VSANs
第21题:
One fibre channel switch
Two fibre channel switches
Two Ethernet cards
Nothing
第22题:
Clustering
NIC teaming
OSPF
VLAN tagging
第23题:
two DS8700 systems with two-way processor cards and 600 GB FC drives
two DS8700 systems with four-way processor cards and LPAR
two DS8700 systems with two-way processor cards and two frames per system
two DS8700 systems with four-way processor cards and two frames per system