A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
A. operator training
B. cache size of the two clusters
C. fibre bandwidth capability between the sites
D. number of stacked tape drives attached to each cluster
第1题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第2题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第3题:
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
第4题:
A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()
第5题:
A customer wants to improve the utilization of the current capacity of their existing N series Tier 1production storage. What solution would the storage specialist discuss with the customer?()
第6题:
A current System z customer has 10,000 IBM 3490 tape cartridges, most of which are only 10%utilized, in their tape shelf storage adjacent to the computer room. The customer currently has nospace for the new DS8700 that is on order. What should the IBM storage specialist propose as asolution?()
第7题:
Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology. Which of the following best describes the network requirements?()
第8题:
compression with IBM Real-time Compression Appliances
deduplication with IBM ProtecTIER
virtualization with IBM SVC
file virtualization with SONAS
第9题:
throughput
automatic tape reclamation
3490E tape volume emulation
disk and tape (physical) storage included in same frame
第10题:
The service IP addresses must be on a separate subnet and VLAN.
The non-service and service IP addresses must be on the same subnet and on the same VLAN.
All interfaces on a node must be in different subnets. All subnets must be on the same VLAN.
One non-service and one service IP address must be on the same logical subnet. All interfaces must be on the same VLAN.
第11题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第12题:
SAN switches
Fibre channel Hub(s)
IBM Storage Manager Agents
IBM Subsystem Device Driver
第13题:
A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()
第14题:
What is an advantage of IBM SAN Volume Controller (SVC) virtualization over an HP EnterpriseVirtual Array virtualization?()
第15题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第16题:
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
第17题:
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution best meets the specified requirements()
第18题:
Your company has an Active Directory forest. The forest contains two sites named Site1 and Site2. You plan to deploy Exchange Server 2010 servers in both sites. You need to plan a high-availability solution for the Mailbox servers that meets the following requirements:.Users must be able to access their mailboxes if a single server fails .Users must be able to access their mailboxes remotely if a single site becomes unavailable What should you do?()
第19题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第20题:
A
B
C
D
第21题:
SnapCopy
DACstore
FlexClone
RAID Protect
第22题:
HACMP Hardware Services
p5-570 differences update
HACMP SmoothStart Services
AIX installation education
第23题:
VNX
VPLEX
V-Series
USP-V