A power module has failed and there is not enough power to see video on all blades.
MUX 3 on theBladeCenter backplane has failed.
A firmware update is required on the AMM.
A second AMM is required to view video on blades 9-14.
第1题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()
第2题:
A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()
第3题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第4题:
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
第5题:
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
第6题:
A power module has failed and there is not enough power to see video on all blades.
MUX 3 on theBladeCenter backplane has failed.
A firmware update is required on the AMM.
A second AMM is required to view video on blades 9-14.
第7题:
Two additional power supplies
Fibre Channel (FC) switches and SAN storage
A Nortel 1/10 GB ESM
SSD for the HX5
第8题:
Back up the AMM configuration to a file
Back up the AMM configuration to the chassis
Back up the AMM using IBM Systems Director
Back up the AMM using Tivoli Storage Manager
第9题:
6
8
10
12
第10题:
Copper Pass-thru Modules only support 1000Mb line speeds.
Spanning Tree has been enabled on the Copper Pass-thru Module.
The customer does not have the latest firmware loaded on the Copper Pass-thru Module.
The customer is using LS21 Blades
第11题:
4
3
2
8
第12题:
One 50 GB SATA 1.8 inch SSD
Two 73GB 10K SAS HDD SFF
Two 31 GB SATA 2.5 inch SSD
Two 50GB SATA 1.8 inch SSD
第13题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
第14题:
螺旋桨有四个桨叶。 ()
第15题:
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
第16题:
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()
第17题:
A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()
第18题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第19题:
The Blades must use the same CIOv and CFFh expansion adapter types.
Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.
The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.
The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
第20题:
The helm has four blades.
The propeller has forty blades.
The windlass has four blades.
The propeller has four blades.
第21题:
12
10
8
6
第22题:
windlass
steer
propeller
helm
第23题:
The room temperature has reached 23C (73.4F).
A Blade within the chassis has been shut down.
The ambient temperature in the data center has increased
One of the additional System X servers in the BladeCenter rack has failed.
第24题:
SAN Switch modules
Blowers
Power supplies
Battery backup units