当前分类: IBM(000-237)
问题:单选题While reviewing the HACMP log file, a warning message appears stating that a custom event script could not be found. A check of the current path settings indicates that all required paths are present. What step can be taken to correct the missing path...
查看答案
问题:单选题During the process of fallover testing, a client/server database needs to be tested. On the AIX Server, start/stop/cleanup scripts and server application functionality have been tested. Before moving onto the next step of fallover testing,what action ...
问题:单选题While reviewing the hacmp.out after a node failure,an administrator realizes that the custom Event queue_down did not execute. The queue_down event shows up when a list of custom events is displayed. What would be the next logical step to resolve this...
问题:单选题Which log contains the output generated when starting and stopping a cluster?()A tmp/cspoc.logB /tmp/hacmp.outC /var/adm/ras/hacmp.errorD /var/hacmp/clcomd/clcomddiag.log...
问题:单选题An HACMP cluster is planned for two logical partitions on IBM p690 servers. Both partitions have three network interface adapters: two service adapters on a production network connected to an IP switch, and an administration adapter on a stand-alone h...
问题:单选题In order to eliminate single points of failure before installing HACMP, the rootvg should be mirrored. What command needs to be performed in order to verify the rootvg is mirrored and syncd?()A lslv -M hd5B lspv rootvgC lsvg -I rootvgD bootlist -m...
问题:单选题A cluster administrator has been asked to install HACMP on two nodes with the following hardware: -two CPUs, - 1GB RAM, - one 1 36GB drive, -two 10/100/1000 Ethernet adapters, and -GB Fibre Channel adapters dual attached to SAN storage. In order to...
问题:单选题Following a successful migration,it is highly recommended that concurrent Volume Groups be Converted to enhanced concurrent capable Volume Groups. In order to follow this recommendation,what step must be completed first?()A The Volume Groups must be ...
问题:单选题A two-node cluster has both a single TCP/IP heartbeat and a single non-IP serial heartbeat. TheService Level Agreement regarding the speed of cluster fallover has been updated,and Fast Disk Takeover will be implemented to meet the new Service Level Agr...
问题:单选题The Cluster Administrator wants to use disk heartbeats as a non-IP network. What Volume Group consideration must be accounted for prior to configuring disk heartbeats?()A The Volume Group major number must be the same on all nodes.B The Shared Volume...
问题:单选题Company.com performs cluster verification every Sunday night with a corn job. The systems administrator reviews the /var/hacmp/clverify/clverify.log on Monday morning and notice that cluster verification posted a message about inconsistent filesystem n...
问题:单选题Company.com is planning for an HACMP cluster and wants to know more about the network requirements. The plan is to use IPAT via IP aliasing and heartbeating via IP aliasing to preserve the corporate IP addresses. Currently the customer uses a separate ...
问题:单选题Node ’C’ has just completed reintegration in a three-node cluster. The hacmp.out logifle displays The event node_up_complete for Node ’C’. The cluster administrator wishes to verify that the cluster is stable. In addition to reviewing the cluster log...
问题:单选题Company.com has two sites that are 3072 kilometers apart and wants to implement HACMP between eh two locations. The nodes at each location must be capable of running the application in the event of a failure. Currently the customer’s disk technology i...
问题:单选题An install of cluster .es software failed. Output from the failure indicates missing system requisites. Every subsequent attempt to install the software abended. In order for the cluster to install,the most likely way for the administrator to resolve...
问题:单选题During a planning meeting, Company.com indicates that they intend to make a relational Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab. How would this be managed in an HACMP environme...
问题:单选题What is required during the initial creation of a cluster?()A Nothing,because HACMP will discover the configurationB The cluster name and a TCP/IP path to each of the nodesC The cluster name and ID and a TCP/IP path to each of the nodesD The cluste...
问题:单选题When a problem occurs in an HACMP cluster,which log file will show the high level overview of the cluster operation?()A /tmp/hacmp.outB /tmp/clstrmgr.debugC /usr/es/adm/cluster.logD /var/hacrmp/clverify/clverify.log...
问题:单选题During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups. A serial ...
问题:单选题During a planning session, the customer indicates the need to provide high availability between a Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in t...