单选题An administrator mistakenly shutdown production after a fallover because the service IP address  Was shifted from the normal production node to the standby node.  What can be done to avoid this type of mistake in the future?()AInclude the service IP ad

题目
单选题
An administrator mistakenly shutdown production after a fallover because the service IP address  Was shifted from the normal production node to the standby node.  What can be done to avoid this type of mistake in the future?()
A

 Include the service IP address in the administrator’s PS1 prompt

B

 Alias the service IP address to the hostname in the /etc/host file

C

 Define a persistent IP address with HACMP and make it a practice to use the persistent address for administration work

D

 Add a DNS entry to map the standby node name to the service IP address so telnet connections will be to the correct node


相似考题
参考答案和解析
正确答案: C
解析: 暂无解析
更多“单选题An administrator mistakenly shutdown production after a fallover because the service IP address  Was shifted from the normal production node to the standby node.  What can be done to avoid this type of mistake in the future?()A  Include the service IP ”相关问题
  • 第1题:

    While an electrician was adding additional circuits for the Data Center, the system running the Database inadvertently powered down. The fallover of the service IP labels and volume groups to the hot standby node completed as expected; however, the database did not start. The database log file indicated that the database was already started.  What is the most likely cause of this problem?()  

    • A、 The shared logical volumes and filesystems did not have database permissions.
    • B、 There was a test instance running on the standby system that must be shutdown.
    • C、 The tablespaces had an indicator indicating that the database had not shutdown properly.
    • D、 The startup script for the highly available instance did not first perform cleanup operations.

    正确答案:D

  • 第2题:

    A cluster using IPAT via IP aliasing has four adapters. Normally there are several resource  groups that have a total of four service IP labels. When two of the adapters fail, what happens?()  

    • A、 The resource group containing the IP labels changes to an "offline" state.
    • B、 The IP service labels of the failed adapters relocate the surviving adapters.
    • C、 Nothing because the resource groups wait for the adapters to become active again.
    • D、 The resource groups containing the IP labels of the failed adapters migrate to a backup node.

    正确答案:B

  • 第3题:

    Company.com has a three-node cluster with six resource groups. There are two resource groups  for each node. A new hardware component will be added to one of the nodes. The customer wants to move the resource groups to other nodes,but not necessarily in the normal fallover order. Also,the resource groups must be moved at night when there is no one in the computer center. What can be done so that the resource group is moved at the most convenient normal fallover order. Also,the resource groups must be moved at night when there is no one in the computer center.  What can be done so that the resource group is moved at the most convenient time for the customer?()   

    • A、 Create a custom resource group with a custom fallback timer to cause the system shutdown at he appropriate time.
    • B、 Set the system to stop with "shutdown" command at the appropriate time and allow HACMP to relocate the resources.
    • C、 Use a script that calls the cIRGmove command and place it in the cron or a queue to execute at the appropriate time.
    • D、 Change the existing resource groups to a custom type and add a timer to perform a "shutdown -h" command at the appropriate time.

    正确答案:C

  • 第4题:

    A two-node cluster is configured for mutual takeover with two service IP labels. The cluster is Being tested for fallover behavior. Both nodes in the cluster have two network interfaces (ent0’ and ’ent1’) configured with IPAT via IP Replacement. When the network cable is removed from the interface card with the service address (’ent0’), the service address is moved to ’ent1’, and ’ent0’ is reconfigured on its boot address. When the network cable is replaced on ’ent0,the service address does not switch back to ’ent0’.  What statement most accurately describes this situation?()   

    • A、 EtherChannel is needed to automatically switch the service IP address back to ’ent0’.
    • B、 This is the default behavior for a network interface failure with this configuration.
    • C、 Gratuitous ARP support needs to be enabled for the IP Network Interface Module in SMIT.
    • D、 The Inactive Network Takeover option should be set to "true" to forece the service address back to ’ent0’.

    正确答案:B

  • 第5题:

    During Company.com planning session, the discussion focuses on how the IP connections are  Managed after a cluster node failure. This is critical for the business since their production application is a Lotus Domino solution requiring multiple IP addresses and recovery time is critical.  What type of IPAT implementation would best address these requirements?()  

    • A、 IPAT via IP aliasing
    • B、 IPAT via IP replacement
    • C、 IPAT via IP aliasing using HWAT
    • D、 IPAT via IP replacement using HWAT

    正确答案:A

  • 第6题:

    Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’  is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources.  What should the administrator do to correct this problem?()   

    • A、 Change the cluster to a rotating design.
    • B、 Change the Cascading without Fallback flag to true.
    • C、 Change the Inactive Takeover field to false in the cluster configuration.
    • D、 Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.

    正确答案:C

  • 第7题:

    单选题
    Company.com has a three-node cluster with six resource groups. There are two resource groups  for each node. A new hardware component will be added to one of the nodes. The customer wants to move the resource groups to other nodes,but not necessarily in the normal fallover order. Also,the resource groups must be moved at night when there is no one in the computer center. What can be done so that the resource group is moved at the most convenient normal fallover order. Also,the resource groups must be moved at night when there is no one in the computer center.  What can be done so that the resource group is moved at the most convenient time for the customer?()
    A

     Create a custom resource group with a custom fallback timer to cause the system shutdown at he appropriate time.

    B

     Set the system to stop with shutdown command at the appropriate time and allow HACMP to relocate the resources.

    C

     Use a script that calls the cIRGmove command and place it in the cron or a queue to execute at the appropriate time.

    D

     Change the existing resource groups to a custom type and add a timer to perform a shutdown -h command at the appropriate time.


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    Continuous availability is required for an application in a two-node cluster. There is one rotating resource group in the cluster, and the nodes are identical machines. Client telnet connections to the application cannot be broken because it takes 20 to 30 minutes to recycle the client workstations and transactions will be lost.  What configuration best provides continuous connectivity to the application?()
    A

     IPAT using IP Replacement without MAC address takeover.

    B

     IPAT using IP Aliasing and hardware MAC address takeover.

    C

     None because continuous telnet connectivity cannot be provided with HACMP.

    D

     Shared service IP address assigned to multiple network interface cards on each node.


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production  Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical.  Which of the following describes the best solution?()
    A

     There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.

    B

     Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.

    C

     Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.

    D

     Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    During cluster fallover testing,the administrator determines that additional work is required to stop existing test applications on the standby node,prior to starting the production applications on the surviving node.  To manage this type of requirement,which step should be performed first?()
    A

     Create a custom pre/post event.

    B

     Add a custom user defined event.

    C

     Define custom error notification.

    D

     Modify the test application server.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    An administrator mistakenly shutdown production after a fallover because the service IP address  Was shifted from the normal production node to the standby node.  What can be done to avoid this type of mistake in the future?()
    A

     Include the service IP address in the administrator’s PS1 prompt

    B

     Alias the service IP address to the hostname in the /etc/host file

    C

     Define a persistent IP address with HACMP and make it a practice to use the persistent address for administration work

    D

     Add a DNS entry to map the standby node name to the service IP address so telnet connections will be to the correct node


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    A cluster using IPAT via IP aliasing has four adapters. Normally there are several resource  groups that have a total of four service IP labels. When two of the adapters fail, what happens?()
    A

     The resource group containing the IP labels changes to an offline state.

    B

     The IP service labels of the failed adapters relocate the surviving adapters.

    C

     Nothing because the resource groups wait for the adapters to become active again.

    D

     The resource groups containing the IP labels of the failed adapters migrate to a backup node.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A cluster with 10 adapters per node is converted to use IPAT address takeover vial IP aliasing.  During the conversion, the customer ran out of IP subnets in the allocated range.  What feature in HACMP can help resolve this issue?()  

    • A、 Disk based heartbeats
    • B、 Heart beating via IP aliasing
    • C、 IP aliases for the non-service addresses
    • D、 A single subnet for all non-standby adapters

    正确答案:B

  • 第14题:

    The IP subsystem fallover behavior of a two-node cluster is being testing in a large client  organization. One of the tests is to simulate a network_down event and verify that HACMP movesthe single resource group to the standby node.  What is the best way to simulate a network down condition?()   

    • A、 Turn off the IP core switch connecting the two nodes.
    • B、 Issue the command "stopsrc -g inetd" on the node that has the resource group.
    • C、 Issue the command "sh /etc/rc.tcpclean" on the node that has the resource group.
    • D、 Simultaneously unplug all network cables from the node that has the resource group.

    正确答案:D

  • 第15题:

    During cluster fallover testing,the administrator determines that additional work is required to stop existing test applications on the standby node,prior to starting the production applications on the surviving node.  To manage this type of requirement,which step should be performed first?()  

    • A、 Create a custom pre/post event.
    • B、 Add a custom user defined event.
    • C、 Define custom error notification.
    • D、 Modify the test application server.

    正确答案:B

  • 第16题:

    An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production  Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical.  Which of the following describes the best solution?()  

    • A、 There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.
    • B、 Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.
    • C、 Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.
    • D、 Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.

    正确答案:B

  • 第17题:

    Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()

    • A、Enable DHCP server on the HMC
    • B、Configure host name and IP address on DNS server
    • C、Manually set the IP address of the service processor
    • D、Connect a RS-232 cable from the HMC to the service processor

    正确答案:A

  • 第18题:

    单选题
    A cluster with 10 adapters per node is converted to use IPAT address takeover vial IP aliasing.  During the conversion, the customer ran out of IP subnets in the allocated range.  What feature in HACMP can help resolve this issue?()
    A

     Disk based heartbeats

    B

     Heart beating via IP aliasing

    C

     IP aliases for the non-service addresses

    D

     A single subnet for all non-standby adapters


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    A database administrator wants a unique IP address for each of three instances of a database.  Normally,all instances run on a large production node,but they may fallover to different standby nodes according to the dynamic node priority configuration.  What is the best way to obtain unique addresses for each of the three database instances?()
    A

     There is no way since this cannot be configured with HACMP

    B

     Use IP Replacement address takeover and define all service addresses on the same NIC

    C

     Use IP Aliasing for address takeover and define each alias in a separate resource group

    D

     Use EtherChannel to map the three alias IP addresses to the common service address defined to HACMP


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    While an electrician was adding additional circuits for the Data Center, the system running the Database inadvertently powered down. The fallover of the service IP labels and volume groups to the hot standby node completed as expected; however, the database did not start. The database log file indicated that the database was already started.  What is the most likely cause of this problem?()
    A

     The shared logical volumes and filesystems did not have database permissions.

    B

     There was a test instance running on the standby system that must be shutdown.

    C

     The tablespaces had an indicator indicating that the database had not shutdown properly.

    D

     The startup script for the highly available instance did not first perform cleanup operations.


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’  is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources.  What should the administrator do to correct this problem?()
    A

     Change the cluster to a rotating design.

    B

     Change the Cascading without Fallback flag to true.

    C

     Change the Inactive Takeover field to false in the cluster configuration.

    D

     Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    During Company.com planning session, the discussion focuses on how the IP connections are  Managed after a cluster node failure. This is critical for the business since their production application is a Lotus Domino solution requiring multiple IP addresses and recovery time is critical.  What type of IPAT implementation would best address these requirements?()
    A

     IPAT via IP aliasing

    B

     IPAT via IP replacement

    C

     IPAT via IP aliasing using HWAT

    D

     IPAT via IP replacement using HWAT


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A two-node cluster is configured for mutual takeover with two service IP labels. The cluster is Being tested for fallover behavior. Both nodes in the cluster have two network interfaces (ent0’ and ’ent1’) configured with IPAT via IP Replacement. When the network cable is removed from the interface card with the service address (’ent0’), the service address is moved to ’ent1’, and ’ent0’ is reconfigured on its boot address. When the network cable is replaced on ’ent0,the service address does not switch back to ’ent0’.  What statement most accurately describes this situation?()
    A

     EtherChannel is needed to automatically switch the service IP address back to ’ent0’.

    B

     This is the default behavior for a network interface failure with this configuration.

    C

     Gratuitous ARP support needs to be enabled for the IP Network Interface Module in SMIT.

    D

     The Inactive Network Takeover option should be set to true to forece the service address back to ’ent0’.


    正确答案: D
    解析: 暂无解析

  • 第24题:

    单选题
    Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()
    A

    Enable DHCP server on the HMC

    B

    Configure host name and IP address on DNS server

    C

    Manually set the IP address of the service processor

    D

    Connect a RS-232 cable from the HMC to the service processor


    正确答案: A
    解析: 暂无解析