Create the VLAN.
Name the VLAN.
Configure an IP address for the VLAN.
Add the desired ports to the new VLAN.
Add the VLAN to the VTP domain.
第1题:
Which of the following ALTER DISKGROUP commands does not use V$ASM_OPERATION to record thestatus of the operation?()
第2题:
Which of the following step libraries is included in the license for IPCC Express Standard? ()
第3题:
A server is experiencing an undetermined problem. Which of the following steps should the technician take in order to identify whether it is a software or hardware problem?()
第4题:
A Windows OS has failed to load after a successful power on self test. Which of the following steps will help troubleshoot the problem?()
第5题:
An administrator is getting reports that a file server is responding slowly. Which of the following steps should the administrator take FIRST?()
第6题:
When setting up a new store, which of the following steps is required in order to use the PasswordInvalidation feature?()
第7题:
The user base of a three-node cluster has increased. In order to add clustered users to all nodes, which of the following steps should be performed?()
第8题:
Chain reaction
Thermal action
Chemical occlusion
Pyrotechnical reaction
第9题:
Add the finance users to the financeData group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group. Then add the financeGG group to the financeData group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group. Add the financeGG group to the financeUG group to the financeDat group to which the necessary permissions have been assigned.
第10题:
Store the mksysb in a safe place because a successful completion guarantees the mksysb is good.
Boot from the mksysb to verify it is bootable and list the files on the mksysb.
Look at the bosboot output when the mksysb was created to verify it is good.
List the files on the mksysb beucase listing all the files verifies there are no problems with the mksysb.
第11题:
Identify necessary operating system updates
Implement the change
Document the change
Schedule system down time
第12题:
The ChangePassword page needs to be implemented.
The password policy needs to be defined.
The account lockout policy needs to be defined.
The LoginTimeoutError view and ReLogonForm view need to be defined.
第13题:
Which service components develops a plan that identifies the necessary steps to move from an existing system to the Cisco Unified Communications system()
第14题:
Which two of the following steps are necessary to configure inter-VLAN routing between multilayer switches?()
第15题:
Which of the following printers requires a specialized paper in order to operate?()
第16题:
An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()
第17题:
Which of the following protocols would be used in order to log into a router to configure a VLAN?()
第18题:
An administrator has mirrored rootvg onto hdisk1,after the physical volumes finished syncing the administrator wants to add the newdisk to the boot order.Currently the boot order looks like:hdisk0 blv=hd5. Which of the following commands will add hdisk1 to the current boot order?()
第19题:
Single-celled bacterium
Microevolution
Evolutionary mutations
The genetic record
Intermediate steps
第20题:
Reseat all main components
Try to replicate the problem
Flash the BIOS
Reinstall the operating system
第21题:
On one of the nodes,add the users via C-SPOC ’Add a User to the Cluster’smit menu.
Use C-SPOC to synchronize the password files between cluster nodes.
On all of the nodes,add the users to the /etc/passwd and system security files,and then synchronize the cluster.
On one of the nodes,add the users to the /tec/passwd and system security files,add home directories,and use cron to automate the movement of system security files between nodes.
第22题:
Create the VLAN.
Name the VLAN.
Configure an IP address for the VLAN.
Add the desired ports to the new VLAN.
Add the VLAN to the VTP domain.
第23题:
ICM steps
e-mail steps
media steps
database steps
第24题:
Add the finance users to the financeData group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group. Then add the financeGG group to the financeData group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group. Add the financeGG group to the financeUG group to the financeDat group to which the necessary permissions have been assigned.