参考答案和解析
正确答案: A
解析: 该题的关键词为"work breakdown structure、 major project deliverables",其语句结构为"The creation ofa work breakdown structure (WBS)(主语)is(谓语)the processof()the major project deliverables",含义为"创建WBS是怎样主要的项目交付物的过程"。根据WBS定义以及选项,容易识别出应选择分解(subdividing)
更多“The creation ofa work breakdown structure (WBS) is the proce”相关问题
  • 第1题:

    106 The "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as:

    A. Work packages.

    B. Subtasks.

    C. Tasks.

    D. Code of accounts.

    E. Integration points


    正确答案:C

  • 第2题:

    23 The work breakdown structure (WBS) is first developed in which scope management process? A. Initiation

    B. Scope planning

    C. Scope change control

    D. Scope

    Definition

    E. Scope verification


    正确答案:D

  • 第3题:

    ● A work breakdown structure is most useful for:

    A identifying individual tasks for a project

    B scheduling the start of tasks

    C developing a cost estimate

    D determining potential delays

    E A and C


    正确答案:E

  • 第4题:

    ● The Work Breakdown Structure (WBS) is the basis for communicating:

    A Project scope, cost control, schedule, quality

    B Project objectives, dependencies, plan, cost control

    C Project scope, schedule, staffing, cost control

    D Project scope, quality, schedule, dependencies

    E Project budget, schedule, risk factors, work assignments.


    正确答案:A

  • 第5题:

    ● The "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as:

    A Work packages.

    B Subtasks.

    C Tasks.

    D Code of accounts.

    E Integration points.


    正确答案:C

  • 第6题:

    ● The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the (75) .

    (75)

    A. planning element

    B.work package

    C.subtask

    D. working interface


    正确答案:B

  • 第7题:

    The work breakdown structure (WBS) has been widely used in management for software development project, ( ) is generally NOT validated through the WBS.

    A.Schedule and cost

    B.Organization structuring

    C.Management coordination

    D.Quality of work


    正确答案:D

  • 第8题:

    he work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the()

    A.Planning element
    B.Work package
    C.Subtask
    D.Working interface

    答案:B
    解析:
    工作分解结构包括完整项目的几个层次的分解,在工作分解结构中定义的最低级别总是(75)。A.计划元素B.工作包C.子任务D.工作接口

  • 第9题:

    The creation of a work breakdown structure(WBS)is the process of ( ) the major project deliverables.

    A.subdividing
    B.assessing
    C.planning
    D.integrating

    答案:A
    解析:
    创建工作分解结构是分解项目可交付物的过程。A.分解 B.估算 C.计划 D.整合

  • 第10题:

    组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。


    正确答案:错误

  • 第11题:

    Team member listing, scheduled tasks, and risk identification are part of the:()

    • A、project plan.
    • B、project charter.
    • C、communication plan.
    • D、WBS (Work Breakdown Structure).

    正确答案:A

  • 第12题:

    单选题
    The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.
    A

    subdividing

    B

    assessing

    C

    planning

    D

    integrating


    正确答案: B
    解析: 该题的关键词为"work breakdown structure、 major project deliverables",其语句结构为"The creation ofa work breakdown structure (WBS)(主语)is(谓语)the processof()the major project deliverables",含义为"创建WBS是怎样主要的项目交付物的过程"。根据WBS定义以及选项,容易识别出应选择分解(subdividing)

  • 第13题:

    141 The work breakdown structure (WBS) is first developed in which scope management process? A. Initiation

    B. Scope planning

    C. Scope change control

    D. Scope Definition

    E. Scope verification


    正确答案:D

  • 第14题:

    ● When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at the

    A task

    B level of effort

    C sub-task

    D project

    E work package


    正确答案:E

  • 第15题:

    ● A Work Breakdown Structure:

    A assures all work is identified

    B subdivides the project into manageable segments

    C provides the project sponsor with a time-phase task summary

    D both A and B

    E All of the above.


    正确答案:D

  • 第16题:

    ● The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?

    A Time, schedule and cost.

    B Management coordination and organization structuring.

    C Work methods and accountability.

    D Quality of work.

    E Risk and impact decision-making.


    正确答案:D

  • 第17题:

    ● A work breakdown structure (WBS) is a tool used to define and group a project's discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for(72) .

    (72)

    A.identifying individual tasks for a project

    B.scheduling the start of tasks

    C.scheduling the end of tasks

    D.determining potential delays


    正确答案:A

  • 第18题:

    A schedule is commonly used in project planning and project portfolio management.(73) on a schedule may be closely related to the work breakdown structure(WBS)terminal elements.the statement of work.or a contract data requirements list

    A.Essences

    B.Elements

    C.Purposes

    D. Issues


    正确答案:B
    本题目翻译:进度表是常用的项目规划和项目组合管理。按计划元素可能是密切相关的工作分解结构(WBS)的终端元素,工作的陈述,或合同数据要求清单。考察的是进度计划。

  • 第19题:

    The creation of a work breakdown structure (WBS) is the process of______the major project deliverables.

    A.subdividing

    B.assessing

    C.planning

    D.integrating


    正确答案:A
    解析:创建工作分解结构是分解项目可交付物的过程。选项A是分解,选项B是估算,选项C是计划,选项D是整合。

  • 第20题:

    A schedule is commonly used in project planning and project portfolio management.( ) on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list.

    A.Essences
    B.Elements
    C.Purposes
    D.Issues

    答案:B
    解析:
    时间表常用于项目规划和项目组合管理。时间表的元素与工作分解结构(WBS)的最终元素,工作说明书,或合同数据需求清单密切相关。

  • 第21题:

    为了把一个大的项目分解成多个较小的,更易于管理的项目,黑带此时应该选择以下哪个工具:()。

    • A、结构分析图
    • B、流程图
    • C、WBS(Work Breakdown Structure)
    • D、AND(Activity Network Diagram)

    正确答案:C

  • 第22题:

    The SOW (Statement of Work) is another name for the:()

    • A、WBS (Work Breakdown Structure).
    • B、cost benefit analysis.
    • C、requirements specifications.
    • D、narrative description of the work to be accomplished.

    正确答案:D

  • 第23题:

    单选题
    The SOW (Statement of Work) is another name for the:()
    A

    WBS (Work Breakdown Structure).

    B

    cost benefit analysis.

    C

    requirements specifications.

    D

    narrative description of the work to be accomplished.


    正确答案: A
    解析: 暂无解析

  • 第24题:

    判断题
    组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。
    A

    B


    正确答案:
    解析: 暂无解析