Challenge
Exploit
Avoid
Enhance
第1题:
The()process analyzes the effect of risk events and assigns a numerical rating to those risks.()A.Risk Identification B.Quantitative Risk AnalysisC.Qualitative Risk Analysis D.Risk Monitoring and Control
第2题:
听力原文:M: Can you give an example of types of risks Banks face?
W: Yes. The major type of risks is called credit risk. It means a counterpart fails to perform. according to a contractual arrangement.
Q: What are they talking about?
(13)
A.A contractual arrangement.
B.A counterpart.
C.Many types of risks.
D.Credit risk.
第3题:
setting redundant components in subsystem to handle with the risks brought by the defaultsof original components,what kind of risk response strategy is this?()
A.risk avoidance
B.risk acceptance
C.risk mitigation
D.contingency plan
第4题:
The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal Of the plan is to minimize threats and maximize opportunities. When dealing with negative risks,there are three main response strategies______,Transfer, Mitigate.
A.Challenge
B.Exploit
C.Avoid
D.Enhance
第5题:
第6题:
第7题:
第8题:
setting redundant components in subsystem to handle with the risks brought by the defaults of original components,what kind of risk response strategy is this?()
第9题:
The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies(),rransfer ,Mitigate.
第10题:
only when there is positive stability
only when there is negative stability
only when there is neutral stability
at all times
第11题:
share
Mitigate
Transfer
Acceptance
第12题:
risk avoidance
risk acceptance
risk mitigation
contingency plan
第13题:
●Several risk response strategies are available.(75) the risk simply gives another party responsibility for its management,it does not eliminate risk.
(75) A. Avoiding
B. Mitigating
C. Accepting
D. Transferring
第14题:
Setting redundant components in subsystem to handle with the risks brought by the defaults of original components, what kind of risk response strategy is this ? ( 75 ).
A.Risk avoidance
B.Risk acceptance
C.Risk mitigation
D.Contingency plan
第15题:
()is the process of implementing risk response plans,tracking identified risks,monitoring residual risk,identifying new risk,and evaluating risk process effectiveness throughout the project.
A.Identity risks
B.Control risks
C.Plan risk responses
D.Plan risk management
第16题:
第17题:
第18题:
第19题:
What are the three main types of networks that must be considered when defining a security policy?
第20题:
()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.
第21题:
There are strategies typically deal with threats or risk that may have negative impacts on project objectives if they occur, some other strategies are suggested to deal with risks with potentially positive impacts. ()is a risk response strategy that may be adopted for either threats or opportunities.
第22题:
第23题:
Quantitative Risk Analysis
Qualitative Risk Analysis
Enterprise Environmental Factors
Risk Management Plan
第24题:
Challenge
Exploit
Avoid
Enhance