以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity

题目

以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity of hatchway; 6) During loading , care about list and heeling angle do not exceed 3; 7) After loading 800t (flexible weight), please pay attention to satisfy the requirement of draft difference in trim 0.5~ 1.0m .

  • A、1)严格按配载计划要求执行;2)分两轮隔舱装;
  • B、3)第一轮每舱1000t,隔舱装载;4)第二轮每舱8000t,隔舱装载;5)在舱口范围内尽量装平;
  • C、6)装货过程中注意左右均横,横倾角不超过3°;7)装载最后800t(机动重量)时,请注意满足尾倾0.5~1.0m的吃水差要求。
  • D、以上都对

相似考题
更多“以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity ”相关问题
  • 第1题:

    ______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.

    A.Alternate hold loading condition

    B.Block hold loading condition

    C.Part hold loading condition

    D.Homogeneous hold loading condition


    正确答案:B

  • 第2题:

    ______ is not one of the more commonly adopted solid bulk cargo distributions.

    A.Alternate hold loading condition

    B.Block hold loading condition

    C.Part hold loading condition

    D.Inhomogeneous hold loading condition


    正确答案:D

  • 第3题:

    When loading a tanker,you should ______.

    A.load only one tank at a time

    B.keep the seamen on watch on standby in the mess room

    C.keep a strain on the loading hoses

    D.close valves by closing them down,reopening one or two turns,and re-closing


    正确答案:D

  • 第4题:

    英文备注“Implement the requirement of Stowage plan strictly”的中文意思是:()

    • A、 严格按配载计划要求执行
    • B、 请进行相应的积载工作
    • C、 请根据要求制作积载计
    • D、 积载计划的要求已经确定

    正确答案:A

  • 第5题:

    语句 select round(13.4321,2), round(13.4567,3)的执行结果是:()。


    正确答案:13.43 13.457

  • 第6题:

    英文备注“First round 1000t each hold, separation loading”的中文意思是:()

    • A、第一次两个舱分开装
    • B、第一次装1000t,第二次再装1000t
    • C、第一轮每舱1000t,隔舱装载
    • D、第一轮每舱1000t,分开来装

    正确答案:C

  • 第7题:

    英文备注“load evenly as far as possible in the vicinity of hatchway”的中文意思是:()

    • A、在舱口边尽量装平
    • B、在舱口下方尽量装平
    • C、在舱口以外的地方尽量装平
    • D、在舱口范围内尽量装平

    正确答案:D

  • 第8题:

    For which two tasks would it be best NOT to use the utility SQL*Loader?()

    • A、When loading selected rows into each table.
    • B、When loading data from an export dump file.
    • C、When loading data from disk, tape, or named pipes.
    • D、When your data is NOT being inserted from a flat file.
    • E、When using a record management system to access data files.

    正确答案:B,D

  • 第9题:

    关于ROUND()函数,下列计算那个是不正确的()。

    • A、Round(103.456,2)的返回值为103.46
    • B、Round(3274.56,-1)的返回值为3270
    • C、Round(3274.56,-2)的返回值为3300
    • D、round(1256.233,2)的返回值为1256.24

    正确答案:D

  • 第10题:

    单选题
    In order to reduce the accumulation of static electricity while loading petroleum products, you should().
    A

    start to load at maximum pressure

    B

    start to load slowly

    C

    increase the air flow into the tank

    D

    use the overall method of loading only


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Which narrative regarding loading software is incorrect?()
    A

    The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet

    B

    A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship

    C

    Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test

    D

    A Loading Program may be provided as a classification requirement or as an Owner’s option


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Loading cargo operation in hold No.3 stopped owing to().
    A

    gangs employed

    B

    windlass trouble

    C

    gangs unavailable

    D

    shortage of navigational charts


    正确答案: C
    解析: 暂无解析

  • 第13题:

    You are scheduled to load a bulk shipment of steel turnings.Which statement is TRUE ________.

    A.The primary hazard of this cargo is that it is subject to spontaneous heating and ignition

    B.The shipping papers should describe this cargo as Waste,Steel Borings

    C.After loading,you may not sail if the temperature in each hold of steel turnings exceeds 54℃

    D.This cargo may not be transported in bulk unless a special permit is issued by the competent authorities


    正确答案:D

  • 第14题:

    You are loading a cargo of bagged coffee beans.To keep cargo leakage from being contaminated by the ship's structure,you should ______.

    A.use separation cloths between the deck and cargo

    B.place the cargo on a layer of spaced dunnage

    C.hose down the deck before loading the cargo

    D.use bag-on-bag stowage


    正确答案:A

  • 第15题:

    以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.

    • A、1)严格按配载计划要求执行;2)申请理货;
    • B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;
    • C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。
    • D、以上都对

    正确答案:D

  • 第16题:

    以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay two tiers wood block and one tier mat on China wood oil 、 bauxite 、 sausage skin 、 flint clay

    • A、1)严格按配载计划要求执行;2)申请理货;
    • B、3)吊杆安全负荷量3t;4)No.3舱二层舱烤烟留通风道30厘米,上铺木板;
    • C、5)桐油、铝矾土、肠衣、焦宝石上铺二层木板,一层席子。
    • D、以上都对

    正确答案:D

  • 第17题:

    英文备注“Two round Loading”的中文意思是:()

    • A、两个计划装载
    • B、分两轮隔舱装
    • C、两个装载舱
    • D、两部分进行装载

    正确答案:B

  • 第18题:

    英文备注“second round 8000t each hold,separation loading”的中文意思是:()

    • A、第二次每舱装8000t
    • B、第二次每舱装8000t,分开来装
    • C、第二轮每舱8000t,隔舱装载
    • D、第二轮每舱8000t,分开来装

    正确答案:C

  • 第19题:

    Which narrative regarding loading software is incorrect?()

    • A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet
    • B、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship
    • C、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test
    • D、A Loading Program may be provided as a classification requirement or as an Owner’s option

    正确答案:A

  • 第20题:

    You have an Exchange Server 2010 organization.  The organization contains two servers named Server1 and Server2.  Server1 and Server2 have the Mailbox server role and the Hub Transport server role installed. Server 1 and Server2 are members of a database availability group (DAG).  You need to plan the deployment of Client Access servers to meet the following requirements: .Users must be able to access their mailboxes if a single server fails .Users must not attempt to connect to a failed server  What should you include in your plan?()

    • A、On Server1 and Server2, install the Client Access server role. Implement failover clustering.
    • B、On Server1 and Server2, install the Client Access server role. Configure network interface card (NIC) teaming on each server.
    • C、Deploy two new Client Access servers. Implement load balancing by using DNS round robin.Create a Client Access server array.
    • D、Deploy two new Client Access servers. Implement load balancing by using a Windows Network Load Balancing cluster. Create a Client Access server array.

    正确答案:D

  • 第21题:

    单选题
    The stowage factor should be calculated().
    A

    before the stowage plan is made

    B

    when the stowage plan is made

    C

    after the stowage plan is made

    D

    before loading


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    For the purposes of cargo oil containment,the fixed container under the manifold of an eight-inch loading line must hold a minimum of().
    A

    three barrels

    B

    four barrels

    C

    six barrels

    D

    eight barrels


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    The British Royal Society for the Prevention of Accidents (ROSPA) is petitioning to keep the UK on British Summer Time all year round, and they claim that nearly 450 serious accidents occur each year because of the time change.
    A

    all year round, and they claim that nearly 450 serious accidents occur each year because of the time change

    B

    all throughout the year, and they claim that nearly 450 serious accidents occur each year because of it

    C

    all year, claiming that nearly 450 serious accidents occur each year because of it

    D

    all year round, claiming that nearly 450 serious accidents occur each year because of the time change

    E

    all year round, and they claim that nearly 450 serious accidents occur each and every year because of the time change


    正确答案: D
    解析:
    A,B,E项中复数形式的代词和单数形式的“The British Royal Society”不一致。C项中的代词“it”指代模糊。只有D项没有错误。