以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity of hatchway; 6) During loading , care about list and heeling angle do not exceed 3; 7) After loading 800t (flexible weight), please pay attention to satisfy the requirement of draft difference in trim 0.5~ 1.0m .
第1题:
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.
A.Alternate hold loading condition
B.Block hold loading condition
C.Part hold loading condition
D.Homogeneous hold loading condition
第2题:
______ is not one of the more commonly adopted solid bulk cargo distributions.
A.Alternate hold loading condition
B.Block hold loading condition
C.Part hold loading condition
D.Inhomogeneous hold loading condition
第3题:
When loading a tanker,you should ______.
A.load only one tank at a time
B.keep the seamen on watch on standby in the mess room
C.keep a strain on the loading hoses
D.close valves by closing them down,reopening one or two turns,and re-closing
第4题:
英文备注“Implement the requirement of Stowage plan strictly”的中文意思是:()
第5题:
语句 select round(13.4321,2), round(13.4567,3)的执行结果是:()。
第6题:
英文备注“First round 1000t each hold, separation loading”的中文意思是:()
第7题:
英文备注“load evenly as far as possible in the vicinity of hatchway”的中文意思是:()
第8题:
For which two tasks would it be best NOT to use the utility SQL*Loader?()
第9题:
关于ROUND()函数,下列计算那个是不正确的()。
第10题:
start to load at maximum pressure
start to load slowly
increase the air flow into the tank
use the overall method of loading only
第11题:
The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet
A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship
Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test
A Loading Program may be provided as a classification requirement or as an Owner’s option
第12题:
gangs employed
windlass trouble
gangs unavailable
shortage of navigational charts
第13题:
You are scheduled to load a bulk shipment of steel turnings.Which statement is TRUE ________.
A.The primary hazard of this cargo is that it is subject to spontaneous heating and ignition
B.The shipping papers should describe this cargo as Waste,Steel Borings
C.After loading,you may not sail if the temperature in each hold of steel turnings exceeds 54℃
D.This cargo may not be transported in bulk unless a special permit is issued by the competent authorities
第14题:
You are loading a cargo of bagged coffee beans.To keep cargo leakage from being contaminated by the ship's structure,you should ______.
A.use separation cloths between the deck and cargo
B.place the cargo on a layer of spaced dunnage
C.hose down the deck before loading the cargo
D.use bag-on-bag stowage
第15题:
以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.
第16题:
以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay two tiers wood block and one tier mat on China wood oil 、 bauxite 、 sausage skin 、 flint clay
第17题:
英文备注“Two round Loading”的中文意思是:()
第18题:
英文备注“second round 8000t each hold,separation loading”的中文意思是:()
第19题:
Which narrative regarding loading software is incorrect?()
第20题:
You have an Exchange Server 2010 organization. The organization contains two servers named Server1 and Server2. Server1 and Server2 have the Mailbox server role and the Hub Transport server role installed. Server 1 and Server2 are members of a database availability group (DAG). You need to plan the deployment of Client Access servers to meet the following requirements: .Users must be able to access their mailboxes if a single server fails .Users must not attempt to connect to a failed server What should you include in your plan?()
第21题:
before the stowage plan is made
when the stowage plan is made
after the stowage plan is made
before loading
第22题:
three barrels
four barrels
six barrels
eight barrels
第23题:
all year round, and they claim that nearly 450 serious accidents occur each year because of the time change
all throughout the year, and they claim that nearly 450 serious accidents occur each year because of it
all year, claiming that nearly 450 serious accidents occur each year because of it
all year round, claiming that nearly 450 serious accidents occur each year because of the time change
all year round, and they claim that nearly 450 serious accidents occur each and every year because of the time change