LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERAL ARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,______ is not mentioned.A.the vessel will shift to a

题目

LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERAL ARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,______ is not mentioned.

A.the vessel will shift to another berth

B.loading is in normal progress

C.she is expected to leave 2400 tonight

D.the arrangement of her loading operations is far from satisfactory


相似考题
更多“LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERAL ARRANGEMENT SHE WILL ”相关问题
  • 第1题:

    42. —I hear Yang Yan made an English speech at the graduation ceremony yesterday.

    —__________and____________ .

    A. So she did; so did I

    B. So did she; so I did

    C. So she was; so I was

    D. So was she; so I was


    正确答案:A
    42.A【解析】句意:——我听说杨艳在昨天的毕业典礼上做了一个英语演讲。——确实如此,而且我也是。根据题意前者表强调,而后者意为“……也是”。

  • 第2题:

    Where temporary repairs are effected to a ship at a port of loading,call or refuge,for the common safety,or of damage caused by general average sacrifice,the cost of such repairs shall be ______ as general average.

    A.fitted

    B.omitted

    C.committed

    D.admitted


    正确答案:D

  • 第3题:

    ______ is not an item shown in General Arrangement Plan.

    A.The details of the general emergency alarm signal

    B.The position of dampers

    C.Identification numbers of the ventilating fans serving each section

    D.The fire-extinguishing appliances


    正确答案:A

  • 第4题:

    材料:

    When a ship shall have entered a port or place of refuge or shall have returned to her port or place of loading in consequence of accident,sacrifice or other extraordinary circumstances which render that necessary for the common safety,the expenses of entering such port or place shall be admitted as general average;and when she shall have sailed thence with her original cargo,or a part of it,the corresponding expenses of leaving such port or place of refuge consequent upon such entry or return shall likewise be admitted as general average.

    When a ship is at any port or place of refuge and is necessarily removed to another port or place because repairs cannot be carried out in the first port or place,the provisions of this Rule shall be applied to the second port or place as if it were a port or place of refuge and the cost of such removal including temporary repairs and towage shall be admitted as general average.

    The cost of handling on board or discharging cargo,fuel or stores whether at a port or place of loading,call or refuge,shall be admitted as general average,when the handling or discharge was necessary for the common safety or to enable damage to the ship caused by sacrifice or accident to be repaired,if the repairs were necessary for the safe prosecution of the voyage,except in cases where the damage to the ship is discovered at a port or place of loading or call without any accident or other extraordinary circumstances connected with such damage having taken place during the voyage.

    问题:

    The cost of handling on board cargo for the purpose of restowage for the common safety shall be admitted as ________.

    A.particular average

    B.common average

    C.general average

    D.private average

    The repairs ________ shall not be admitted as general average.A.necessary for the common safety

    B.necessary for the safe prosecution of the voyage

    C.of the steering gear in consequence of accident endangering the ship and/or her cargo

    D.of the damages discovered at a port or place of loading or call without any accident or other extraordinary circumstances

    ________ shall not be admitted as general average.A.the expenses of entering port or place of refuge

    B.the corresponding expenses of leaving port or place of refuge

    C.the cost of removal from port or place of refuge including temporary repairs and towage

    D.the cost of handling on board or discharging cargo,fuel or stores solely for the purpose of restowage due to shifting during the voyage

    This passage is likely extracted from ________.A.Marpol

    B.ISM Code

    C.SOLAS

    D.York-Antwerp Rules

    请帮忙给出每个问题的正确答案和分析,谢谢!


    问题 1 答案解析:C


    问题 2 答案解析:D


    问题 3 答案解析:D


    问题 4 答案解析:D

  • 第5题:

    汉译英:“目的港”,正确的翻译为( )。

    A. port of loading B. port of destination
    C. port of discharge D. port of dispatch


    答案:B
    解析:

  • 第6题:

    汉译英:“装货港;到达日期”,正确的翻译为:( )。
    A. Port of loading ; Date of departure B. Port of discharge ; Date of departure
    C. Port of loading ; Date of arrival D. Port of discharge ; Date of arrival


    答案:C
    解析:

  • 第7题:

    port-of-loading的意思是()


    正确答案:装货港

  • 第8题:

    单选题
    The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
    A

    the port of destination

    B

    the next port of call

    C

    the port of arrival

    D

    the last port of call


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERALARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,()is not mentioned.
    A

    the vessel will shift to another berth

    B

    loading is in normal progress

    C

    she is expected to leave 2400 tonight

    D

    the arrangement of her loading operations is far from satisfactory


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
    A

    in the loading place

    B

    in the port or dock

    C

    in the loading spot

    D

    in the discharging spot


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    How()the cargo at loading port?
    A

    about

    B

    in

    C

    with

    D

    from


    正确答案: A
    解析: 暂无解析

  • 第12题:

    填空题
    port-of-loading的意思是()

    正确答案: 装货港
    解析: 暂无解析

  • 第13题:

    The time of voyage insurance with cargo on board will,in accordance with PICC Clauses, commence from the time of ________ .

    A.unmooring at port of sailing

    B.weighing anchor at port of sailing

    C.loading at port of sailing

    D.sailing from port of sailing


    正确答案:C

  • 第14题:

    It should be noted that laydays do not begin to run ______ the ship is,so far as she is concerned,ready to receive or discharge cargo,unless she would have been ready except for the Charterer's default.

    A.when

    B.at the time that

    C.until

    D.as soon as


    正确答案:C

  • 第15题:

    材料:

    162007 0900

    LT MASTER SIDUS

    DEAR CAPTAIN

    QUOTE

    SAILING INSTRUCTIONS FOR YR VESSEL

    THIS IS R.S.PLATOU,OSLO

    SUBJ:FIXTURE OF YR VSL YOU ARE KINDLY REQUESTED TO PROCEED TO SAN NICOLAS(POSITION S 15° 14′,W O 75° 14′)TO LOAD BLAST FURNACE PELLETS FOR KAOHSIUNG,TAIWAN.(POSITION N 22°37′,E 120°15′).STOWAGE FACTOR 0.461 CUBIC METERS PER METRIC TONNE ACCORDING TO TIME CHARTERER SHOUGANG HIERRO PERU S.A LAYCAN:16 OCT/26 OCT

    QUANTITY:FULL CARGO

    TERMS:ACCORDING TO TIME CHARTER NYPE:FIO

    AGENT LOAD PORT:CONSORCIO EMPRESARIAL AGNAV S.A

    TELEPHONE(0051)330-6605 FAX:(0051)330-2664

    AGENT DISCH PORT:TO BE COMMUNICATED TO U SHORTLY

    REPORTS:ETA MUST BE SENT“MINIHIERRO”LIMA AND TO SAN NICOLAS 5 DAYS IN ADVANCE,AND CONFIRMED 48 HRS AND 24 HRS BEFORE ARRIVAL

    SPECIAL ATTENTION:WHEN CONTACT MADE WITH THE RADIO STATION OAS AT SAN JUAN,A PRE-STOWAGE HATCH LIST WITH SEQUENCE OF LOADING TO BE SENT TO LOAD PORT NOT LESS THAN 48 HRS IN ADVANCE.THE RADIO STATION WILL ALSO COMMUNICATE BERTHING INSTRUCTIONS.ON ARRIVAL SUPPLIER REQUIRES YOUR PRE-STOWAGE PLAN PRIOR TO LOADING,TOTAL CARGO,ESTIMATED HATCH TONNAGE,LOADING SEQUENCE,FUEL WATER AND STORES ON BOARD,DRAUGHT, STABILITY AND TRIM ON FINISHING LOADING.

    DEBALLASTING:ALLOWED AT BERTH PROVIDED CLEAN SUBJECT TO APPROVAL BY PORT AUTHORITY.

    SURVEYS:HOLDS TO BE INSPECTED BEFORE LOADING. CARGO OFFICER TO ACCOMPANY INSPECTOR.ON AND OFF HIRE SURVEYS REQUIRED ACCORDING TO CHARTER PARTY.

    FURTHER INSTRUCTIONS TO FOLLOW SHORTLY.

    BEST REGARDS ROTASJ/KNM

    END QUOTE

    问题:

    The nominated agent for the Vessel at the loading port is ________.

    A.MINIHIERRO

    B.CONSORCIO EMPRESARIAL AGNAV S.A

    C.SAN NICOLAS

    D.SAN JUAN

    The BERTHING INSTRUCTIONS will be obtained from ________.A.the agent at the loading port

    B.discharge port authority

    C.further instructions to follow shortly

    D.the radio station OAS at San Juan

    According to this fixture,________.A.the vessel is not liable for the expenses of loading and discharging

    B.the cargo will be discharged at San Nicolas

    C.the freight of this voyage is likely to be charged as per measurement tonnage of the cargo

    D.the canceling date of this fixture is 16 Oct

    On and off hire surveys should be carried out ________.A.in accordance with the charter-party

    B.as per further instructions

    C.by the cargo officer on board

    D.48 hours prior to arrival at the loading port

    请帮忙给出每个问题的正确答案和分析,谢谢!


    问题 1 答案解析:B


    问题 2 答案解析:D


    问题 3 答案解析:A


    问题 4 答案解析:A

  • 第16题:

    汉译英:“装运港;卸货港”,正确的翻译为( )。
    A. port of transfer ; port of discharge B. port of loading ; port of discharge
    C. port of transfer ; port of destination D. port of loading ; port of desdnafion


    答案:B
    解析:

  • 第17题:

    汉译英:“装货港;到达日期”,正确的翻译为:()
    A.Port of loading ; Date of departure
    B.Port of discharge ; Date of departure
    C.Port of loading ; Date of arrival
    D.Port of discharge ; Date of arrival


    答案:C
    解析:

  • 第18题:

    翻译:any kraft paper and/of dunnage if required at loading port to be for owners’ account


    正确答案:在装货港所需任何垫舱纸板及/或物料应由船方负担

  • 第19题:

    单选题
    The port clearance for a ship should be granted()the completion of loading or discharging in the port.
    A

    before

    B

    when

    C

    after

    D

    during


    正确答案: D
    解析: 暂无解析

  • 第20题:

    问答题
    China has the greatest population in the world and a large pool of research workers, yet it has not produced a single Nobel Prize winner so far. What has caused this situation in your opinion? State your opinion in about 160 words, and write it on the answer sheet.

    正确答案:
    We can often hear the news that an American scientist or a Poland researcher get the Nobel Prize for certain inventions or findings, but China, with the greatest population in the world and a large number of research workers, yet has not produced a single Nobel Prize winner so far. There are various reasons for that.
    First, there are serious problems in the educational system in China. The Chinese education has long been examination-oriented, which means that students are just forced to swallow the existing knowledge, without thinking much about it. Thus, the researchers think that the systems fostered are lacking in a sense of creativity.
    Second, there is too little academic communication between China and the outside world. Due to some historical reasons, China had been isolated from the outside world. Thus it lags behind other countries in science and technology. So what scientists in China are doing now is mainly a repeat of their western counterparts.
    Realizing the problems, the government has made many adjustments: the quality-oriented education is gradually taking the place of the examination-oriented one and a great number of leading technology and experts from the foreign countries are brought in. So, it’s certain that in the near future there will be Nobel Prizewinners in China.
    解析: 暂无解析

  • 第21题:

    单选题
    When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().
    A

    available dunnage,and chocking

    B

    crushability,and inherent vice

    C

    sweat,and weight

    D

    weight,and refrigeration


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().
    A

    the port of destination

    B

    the next port of call

    C

    the port of arrival

    D

    the last port of call


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    Because of the arrangement of the cell guuides, the most important factor while loading containers is the().
    A

    contents of the container

    B

    list of the vessel

    C

    size of the shoreside crane

    D

    weight of the container


    正确答案: A
    解析: 暂无解析