一套完整的集装箱积载图由三个部分组成,即()。
第1题:
Turning accessories on the posts to be dismantled,examined,cleaned,greased,repaired if necessary and refitted.This sentence is most possibly found in ________.
A.Chief Mate's remark on stowage plan
B.Store list made by Chief Engineer
C.Collision Report made by Master
D.Repair List
第2题:
WHEN CONTACT MADE WITH THE RADIO STATION OAS AT SAN JUAN,A PRE-STOWAGE HATCH LIST WITH SEQUENCE OF LOADING TO BE SENT TO LOAD PORT NOT LESS THAN 48 HRS IN ADVANCE.From this fax,the pre-stowage hatch list shall be sent to ______.
A.THE RADIO STATION
B.SAN JUAN
C.OAS
D.LOAD PORT
第3题:
______ is not an item shown in General Arrangement Plan.
A.the sections enclosed by “B” class divisions
B.the ventilating system
C.details of the public address system
D.means of access to different compartments,decks,etc.
第4题:
第5题:
英文备注“Implement the requirement of Stowage plan strictly”的中文意思是:()
第6题:
STOWAGE PLAN.积载计划图 ;FIRE CONTROL PLAN防火控制图。
第7题:
increase the ship's officers' knowledge
extend the ship's officers' knowledge
improve the ship's cargo-handling equipment
raise the working efficiency
第8题:
International Cargo Bureau Regulations
Load Line Regulations
Rules and Regulations for Cargo and Miscellaneous Vessels
vessel's classification society rules and regulations
第9题:
before the stowage plan is made
when the stowage plan is made
after the stowage plan is made
before loading
第10题:
The plan baselines are verified with the SQL profiles.
All fixed plan baselines are converted into nonfixed plan baselines.
All the nonaccepted SQL profiles are accepted into the plan baseline.
The nonaccepted plans in the SQL Management Base are verified with the existing plan baselines.
第11题:
对
错
第12题:
whether
what
why
when
第13题:
4 sanitary storm valves to be dismantled,cleaned,grounded and coated with anti-corrosive paint,then refitted in order.This sentence is most possibly found in ________.
A.Chief Mate's remark on stowage plan
B.Store list made by Chief Engineer
C.Collision Report made by Master
D.Repair List
第14题:
To determine the weight capacity of a deck in a cargo hold,you would refer to the ______.
A.Deadweight scale
B.Deck capacity plan
C.Cubic capacity tables
D.General arrangement plan
第15题:
______ is not an item shown in General Arrangement Plan.
A.The details of the general emergency alarm signal
B.The position of dampers
C.Identification numbers of the ventilating fans serving each section
D.The fire-extinguishing appliances
第16题:
第17题:
What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()
第18题:
Examine the following PL/SQL block: SET SERVEROUTPUT ON SET LONG 10000 ECLARE report clob; BEGIN report := DBMS_SPM.EVOLVE_SQL_PLAN_BASELINE(); DBMS_OUTPUT.PUT_LINE(report); END; Which statement describes the effect of the execution of the above PL/SQL block?()
第19题:
isn't he
doesn't he
hasn't he
didn't he
第20题:
eliminates confusion with the final stowage plan
shows the approximate amount of cargo to be loaded in each hold
expedites the total operation
requires an unproportional number of gang hours of work to discharge the cargo
第21题:
within irregular containers
between irregular containers
on uniform packaged commodities
on general cargo
第22题:
a description and particulars of the unit
a capacity plan showing the capacities and the vertical, longitudinal and transverse centers of gravity of tanks and bulk material stowage spaces
Fuel oil storage and transfer procedures
All of above
第23题:
approval from senior management
end-user requirements
IEEE 802.1X authentication parameters
a summary implementation plan