The tentative cargo plan ________ .
A.eliminates confusion with the final stowage plan
B.shows the approximate amount of cargo to be loaded in each hold
C.expedites the total operation
D.requires an unproportional number of gang hours of work to discharge the cargo
第1题:
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the ______.
A.International Cargo Bureau Regulations
B.Load Line Regulations
C.Rules and Regulations for Cargo and Miscellaneous Vessels
D.Vessel's classification society rules and regulations
第2题:
一套完整的集装箱积载图由三个部分组成,即()。
第3题:
increase the ship's officers' knowledge
extend the ship's officers' knowledge
improve the ship's cargo-handling equipment
raise the working efficiency
第4题:
poor stowage of cargo in a container
fire caused by lightning
overloading
inherent vice
第5题:
Bagged cargo
Bulk grain
Bulk rice
Refrigerated goods
第6题:
before the stowage plan is made
when the stowage plan is made
after the stowage plan is made
before loading
第7题:
within irregular containers
between irregular containers
on uniform packaged commodities
on general cargo
第8题:
hygroscopic cargo
measurement cargo
stowage cargo
weight cargo
第9题:
one short ton
one short metric ton
one long ton
one long metric ton
第10题:
对
错
第11题:
to ensure the safety of the ship and protect the cargo from being damaged
to avoid the rearrangement of the cargo loaded on board
to reject the damaged cargo during loading
to prevent the spontaneous combustion of coal and grain
第12题:
to avoid the rearrangement of the cargo loaded on board
to ensure the safety of the ship and cargo
to reject the damaged cargo during loading operation
to prevent the spontaneous combustion of the coal and grain
第13题:
A cargo that has a stowage factor over 40 is know as a ______.
A.hygroscopic cargo
B.measurement cargo
C.stowage cargo
D.weight cargo
第14题:
STOWAGE PLAN.积载计划图 ;FIRE CONTROL PLAN防火控制图。
第15题:
Load so the trim does not exceed 3 feet by the stern
Make maximum use of existing dunnage
Separate wet and dry cargoes into separate holds
Prevent overcarriage by block stowage
第16题:
International Cargo Bureau Regulations
Load Line Regulations
Rules and Regulations for Cargo and Miscellaneous Vessels
vessel's classification society rules and regulations
第17题:
eliminates confusion with the final stowage plan
shows the approximate amount of cargo to be loaded in each hold
expedites the total operation
requires an unproportional number of gang hours of work to discharge the cargo
第18题:
brace it with dunnage
cover it with large pieces
fill it with small pieces
leave it as it is
第19题:
the space of the ship
the space of one hold
what kind of cargo can be stowed
how much cargo can be stowed
第20题:
could
can
be able to
should
第21题:
placed on deck to support the cargo
separation pieces used to keep cylinders upright and steady
shims for stowing balded cargo
nets placed across the hatch opening to keep the cargo from falling in the hatch
第22题:
ABS
Occupational Safety and Health Administration
MSA
National Cargo Bureau
第23题:
durable packages
small pieces
the cargo in which the voids appear
the cargo suitable for stowage in void spaces