A customer wants to run a Cluster 1600 configuration with multiple p655 servers. They are using the new High Performance Switch for the high-speed interconnection between nodes. Which of the following is the only supported cluster management software?()
第1题:
A new HACMP maintenance level has recently been released. An administrator is creating a project plan that is required for applying the updates for a three-node production cluster. To minimize downtime,what is the best way to accomplish the updates on all cluster nodes?()
第2题:
A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()
第3题:
Multiple users call from the same location saying that they have no network connectivity. The administrator is unable to ping the main switch at that IDF. Which of the following configuration management documents would the administrator MOST likely consult to troubleshoot the issue?()
第4题:
A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()
第5题:
A cluster administrator wants to create a snapshot backup of the cluster. Which smit menu can be used to dothis?()
第6题:
An administrator has a two-node PowerHA cluster in a mutual takeover configuration. He needs to updatefrom 5.5 service pack 1 to 5.5 service pack 2. Which of the following actions will perform the updates with norisk of disruption to applications running in the cluster?()
第7题:
Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()
第8题:
You are the network administrator for your company. The network consists of a single Active Directory domain. All computers on the network are members of the domain. You administer a four-node Network Load Balancing cluster. All nodes run Windows Server 2003. The cluster has converged successfully. You use Network Load Balancing Manager on the default host to configure all nodes of the cluster. The nodes have a single network adapter and are connected to the same switching hub device. Administrators of non-cluster servers that are connected to the same switching hub device report that their servers receive traffic that is destined for the cluster nodes. Receiving this additional network traffic impairs the network performance of the non-cluster servers. You need to ensure that traffic destined for only the cluster nodes is not sent to all ports of the switching hub device. You do not want to move the cluster to another switching hub device. What should you do? ()
第9题:
Your company’s network has client computers that run Windows 7. Multiple users share the computers in the shipping department. These computers reside in the Shipping Computers organizational unit (OU). The company wants to deploy a new application. The application is not packaged. You have the following requirements: Deploy the application to all computers in the shipping department. Perform the deployment from a central location. You need to plan the software deployment process to meet the requirements. Which two actions should you include in the process?()
第10题:
You have a Windows Server 2008 R2 Hyper-V failover cluster with a single iSCSI logical unit number (LUN) and one highly available virtual machine (HAVM). You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You monitor the environment by using Microsoft System Center Operations Manager 2007 R2. You configure a new virtual machine (VM) by deploying a VHD from the VMM library and placing the VHD on the existing iSCSI LUN. You create a HAVM configuration, and you attach the VHD to the configuration. VMM reports the status of the VMs as Unsupported Cluster Configuration. You need to be able to manage the VMs by using VMM. What should you do?()
第11题:
The clstat.cgi program will provide a solution.
The customer must install Tivoli with the HACMP plugin for monitoring the cluster.
The clinfo program included in the HACMP distribution will solve the monitoring issues.
Customize the cluster to send error notifications for every event to an email at the network control center.
第12题:
Create a new rule for TCP port 80 by using the Network Load Balancing Cluster console
Run the wlbs disable command on the cluster nodes
Assign a unique port rule for NLB cluster by using the NLB Cluster console
Delete the default port rules through Network Load Balancing Cluster console
第13题:
A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()
第14题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第15题:
An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
第16题:
An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Theadministrator decided the best course of action was to roll back the changes. Prior to the changes beingmade, a cluster snapshot was taken. Which of the following actions will roll back the changes with the least disruption?()
第17题:
A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 and want to start with three LPARS on each p655 node using a total of four nodes. Each LPAR would need at least 4 x 6239 fibre cards and 2 x 5706 2-port 10/100/1000 Ethernet cards. At a later date, they want to add an additional LPAR to each node to expand to a total of 16 UDB partitions. Which of the following major limitations of this solution should be mentioned to the customer?()
第18题:
A customer wants to implement a clustered database solution on their existing x445 servers. A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards. Which of the following best satisfies their requirements?()
第19题:
Which three statements are true when working with high-availability clusters?()
第20题:
You add a Windows Server 2008 R2 server with the Hyper-V role installed to an existing Hyper-V failover cluster. After you move a virtual machine (VM) to the new cluster node, Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 reports the status of the VM as Unsupported Cluster Configuration. You need to be able to manage the VM by using VMM. What should you do?()
第21题:
Certkiller .com boosts a two-node Network Load Balancing cluster which is called web. CK1 .com. The purpose of this cluster is to provide load balancing and high availability of the intranet website only. With monitoring the cluster, you discover that the users can view the Network Load Balancing cluster in their Network Neighborhood and they can use it to connect to various services by using the name web. CK1 .com. You also discover that there is only one port rule configured for Network Load Balancing cluster. You have to configure web. CK1 .com NLB cluster to accept HTTP traffic only. Which two actions should you perform to achieve this objective()
第22题:
A
B
C
D
第23题:
The valid cluster-id range is between 0 and 255.
JUNOS security devices can belong to more than one cluster if cluster virtualization is enabled.
If the cluster-id value is set to 0 on a JUNOS security device, the device will not participate in the cluster.
A reboot is required if the cluster-id or node value is changed.
JUNOS security devices can belong to one cluster only.