第1题:
106 The "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as:
A. Work packages.
B. Subtasks.
C. Tasks.
D. Code of accounts.
E. Integration points
第2题:
● Going from Level 2 to Level 4 in the work breakdown structure will result in
A Less estimating accuracy
B Better control of the project
C Lower status reporting costs
D A greater likelihood that something will fall through the cracks
E None of the above
第3题:
● The "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as:
A Work packages.
B Subtasks.
C Tasks.
D Code of accounts.
E Integration points.
第4题:
A、here does our general manager
B、here our general
C、manager comes our general manager
D、here comes
E、here comes our general manager
第5题:
A.a, an
B.the, a
C.a, the
第6题:
第7题:
The project manager is developing a project schedule. The project manager negotiated with all the execution organizations, and the task times are as short as possible. After manipulating the schedule, the project completion date is still beyond the date requested by the business owners of the project. The project manager believes that the content agreed on for the project is appropriate, and concludes that this schedule should be taken to the business owners and renegotiated. Which one of the following tools will help the project manager justify the revised schedule?()
第8题:
第9题:
第10题:
delay
delaying
to delay
to be delayed
第11题:
supervise
conceive
revive
imitate
第12题:
第13题:
51 Going from Level 2 to Level 4 in the work breakdown structure will result in
A. Less estimating accuracy
B. Better control of the project
C. Lower status reporting costs
D. A greater likelihood that something will fall through the cracks
E. None of the above
第14题:
● A Work Breakdown Structure:
A assures all work is identified
B subdivides the project into manageable segments
C provides the project sponsor with a time-phase task summary
D both A and B
E All of the above.
第15题:
— You are the manager of the marketing department in your company. A new assistant manager has recently been appointed and will start work soon.
— Write an email to all staff in the department:
— explaining the need for the appointment
— saying when the assistant manager will start work
— describing the experience the assistant manager has.
— Write 40 - 50 words.
From: Candace Woodward
To: All marketing staff
Subject: New assistant manager
第16题:
A.a
B.an
C.the
第17题:
● The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the (75) .
(75)
A. planning element
B.work package
C.subtask
D. working interface
第18题:
第19题:
The SOW (Statement of Work) is another name for the:()
第20题:
第21题:
subdividing
assessing
planning
integrating
第22题:
Configure a Work Manager for premium users with a Minimum Thread Constraint.
Configure a Work Manager for premium users with a higher fair-share-request-class.
Configure a Work Manager for premium users with a higher response-time-request-class.
Configure a Work Manager general users with a Maximum Thread Constraint.
Configure a Work Manager for premium users with a custom request-class.
第23题: