A、its speed
B、its gain
C、the accuracy of the reference voltage
D、the number of binary bits
第1题:
A、willing
B、reluctant
C、hesitant
D、determined
第2题:
______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.
A.Voyage repairs
B.Routine docking
C.Damage repairs
D.Conversion
第3题:
第4题:
I’m ____________ to leave the job, but another firm has offered me a high salary.
A、willing
B、reluctant
C、hesitant
D、determined
第5题:
____, where a ship is refitted for a different use
A.Voyage repairs
B.Routine docking
C.Damage repairs
D.Conversion
第6题: