155 A(n) _____ system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight, storage and loss.
A. Inventory control.
B. Materials management.
C. Procurement.
D. All of the above.
E. A and C only
第1题:
第2题:
第3题:
第4题:
第5题: