120 The Work Breakdown Structure (WBS) is the basis for communicating:A. Project scope, cost control, schedule, qualityB. Project objectives, dependencies, plan, cost controlC. Project scope, schedule, staffing, cost controlD. Project scope, quality, sche

题目

120 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments


相似考题
更多“120The Work Breakdown Structure (WBS) is the basis for communicating: A.Project scope, cos ”相关问题
  • 第1题:

    Validate Scope is the process?of?formalizing?acceptance?of the?Complete()。

    A.project?deliverables
    B.WBS
    C.activities
    D.milestones

    答案:A
    解析:
    本题翻译:确认范围是正式验收项目已完成的(73)的过程。
    A.项目可交付成果B.WBS C.活动D.里程碑
    本题考查的是范围管理中的确认范围,正确选项为A项目可交付成果。
    确认范围是正式验收项目已完成的可交付成果的过程,其主要作用是使验收过程具有客观性,同时,通过验收每个可交付成果,提高最终产品、服务或成果获得验收的可能性。

  • 第2题:

    20、Flex项目布局中,()属性是flex-grow, flex-shrink 和 flex-basis的简写,默认值为0 1 auto。

    A.flex

    B.flex-grow

    C.flex-shrink

    D.flex-basis


    flex

  • 第3题:

    33、Flex项目布局中,()属性是flex-grow, flex-shrink 和 flex-basis的简写,默认值为0 1 auto。

    A.flex

    B.flex-grow

    C.flex-shrink

    D.flex-basis


    flex

  • 第4题:

    【单选题】微信小程序中要获得用户位置权限是否允许的参数是?

    A.scope.authSetting

    B.authSetting.userLocation

    C.scope.getLocation

    D.scope.userLocation


    B

  • 第5题:

    文化产业项目工作分解结构(work_breakdown_structure,WBS)是文化产业项目范围定义中给出的项目工作范围的描述文件。


  • 第6题:

    4. 我在公园义务教太极拳。(on a …basis)


    B