● The critical path is calculated by
A subtracting the end date of task one from the start date of task two.
B determining which tasks have the least amount of total slack.
C totaling the time for all activities.
D determining the shortest path through the network.
E Determining which tasks have the most slack
第1题:
Which of the following impacts the critical path?
A.Changing the task duration.
B.Reduce the free float of an activity.
C.Executing a backward pass
D.A or B
E.None of the above.
第2题:
The critical path in a schedule network is the path that:
A.Takes the longest time to complete
B.Must be done before any other tasks
C.Allows some flexibility in scheduling a start time.
D.Is not affected by schedule slippage
E.All of the above.
第3题:
A non-critical path activity is completed in half the time. Then,
A.The critical path is also reduced.
B.The slack in the path containing this activity will increase.
C.The total cost for this activity has decreased.
D.Manpower from this activity can be assigned to other activities.
E.All of the above.
第4题:
104 A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from 5 to 8. This will result in:
A. A shortening of the critical path.
B. A shortening of the noncritical path.
C. A decrease in the total cost of the project.
D. An increase in the cost of the project.
E. A through D are possible based upon where the resources are deployed
第5题:
130 Standard deviation of project completion is _____ .
A. a relationship of the uncertainty of critical path activities.
B. an indicator of project end date target confidence
C. a function of critical path, leveling and project costs.
D. A and B
E. All of the above
第6题:
● Which of the following is indicative of negative float?
A The late start date is earlier than the early start date.
B The critical path supports the imposed end date.
C The early finish date is equal to the late finish date.
D When leads are employed in the schedule.
E The project is sinking.
第7题:
● Which of the following impacts the critical path?
A Changing the task duration.
B Reduce the free float of an activity.
C Executing a backward pass
D A or B
E None of the above.
第8题:
● The critical path in a schedule network is the path that:
A Takes the longest time to complete
B Must be done before any other tasks
C Allows some flexibility in scheduling a start time.
D Is not affected by schedule slippage
E All of the above.
第9题:
A. SUM(start_date)
B. AVG(start_date)
C. COUNT(start_date)
D. AVG(start_date, end_date)
E. MIN(start_date)
F. MAXIMUM(start_date)
第10题:
When the BGP path selection process is being performed on a Cisco router, which BGP attribute is used first when determining the best path?()
第11题:
You are adatabase developer. You develop atask management application that connect stoa SQLServer 2008 database named TaskDB.Users logon to the application by using a SQLServer login. The application contains amodule named Task that assigns tasks tousers. Information about the setasks is stored in the Tasks table of the TaskDB data base. The Tasks table contains multiple columns. These include the Close Dateand Estimated Timecolumns. The application must meet the following security requirements: Users assigned toad atabase role named User 1 canupd ate all task information columns except the Close Date and the Estimated Time columns in the Tasks table. Administrative users assigned toad atabase role named Task_Admin canupd ateall task information in the Tasks table.You needto design a strategy to meet the security requirements. Which two actions should you perform?()
第12题:
SUM(start_date)
AVG(start_date)
COUNT(start_date)
AVG(start_date, end_date)
MIN(start_date)
MAXIMUM(start_date)
第13题:
In crashing a task, you would focus on:
A.As many tasks as possible.
B.Non critical tasks.
C.Accelerating performance of tasks on critical path.
D.Accelerate performance by minimizing cost.
E.A and D.
第14题:
A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from to . This will result in:
A.A shortening of the critical path.
B.A shortening of the noncritical path.
C.A decrease in the total cost of the project.
D.An increase in the cost of the project.
E.A through D are possible based upon where the resources are deployed.
第15题:
Standard deviation of project completion is _____ .
A a relationship of the uncertainty of critical path activities.
B an indicator of project end date target confidence
C a function of critical path, leveling and project costs.
D A and B
E All of the above.
第16题:
20 A Gantt chart is useful in determining:
A. the level of effort for a task
B when a task starts and stops
C. how tasks are related to each other
D. who is assigned to do a task
E. All of the above
第17题:
● A Gantt chart is useful in determining:
A the level of effort for a task
B when a task starts and stops
C how tasks are related to each other
D who is assigned to do a task
E All of the above.
第18题:
● Which may be employed to shorten a schedule without changing the scope of the task?
A Fast tracking.
B Crashing
C Releasing resources earlier from tasks which were scheduled with a late start.
D Alter to task priorities.
E A or B
第19题:
● In crashing a task, you would focus on:
A As many tasks as possible.
B Non critical tasks.
C Accelerating performance of tasks on critical path.
D Accelerate performance by minimizing cost.
E A and D.
第20题:
● A non-critical path activity is completed in half the time. Then,
A The critical path is also reduced.
B The slack in the path containing this activity will increase.
C The total cost for this activity has decreased.
D Manpower from this activity can be assigned to other activities.
E All of the above.
第21题:
第22题:
A customer needs the ability to recover their data if a total system failure occurs. Which two of the following are the most important considerations in determining the solution?()
第23题:
displaying the total order value for sales representatives 161 and 163
displaying the order total for sales representative 161 in the year 1999
displaying the number of orders that have order mode online and order date in 1999
displaying the number of orders whose order total is more than the average order total for all online orders