单选题A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work ord

题目
单选题
A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work order, after a maintenance manager has approved the work order? ()
A

 Approved (APPR)

B

 Waiting on Materials (WMATL)

C

 Waiting to be Scheduled (WSCH)

D

 Waiting on Plant Condition (WPCOND)


相似考题
更多“单选题A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work ord”相关问题
  • 第1题:

    Project(69)Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

    A.Integration

    B.Scope

    C.Configuration

    D.Requirement


    正确答案:B
    解析:项目范围里管理包括为确保项目包含且仅只包含成功完成项目必需工作的所需过程。

  • 第2题:

    —have to go to work by taxi because my ear__________at the garage.

    A.will be repaired
    B.is repaired
    C.is being repaired
    D.has been repaired

    答案:C
    解析:
    该句意为我不得不打车上班,因为我的车正在车库里维修。主句是一般现在时,故从句应用现在进行时的被动语态。故选C。

  • 第3题:

    Many a young scientist__engaged in the research work.

    A.have
    B.has
    C.have been
    D.has been

    答案:D
    解析:
    【考情点拨】考查主谓一致。【应试指导】句意:很多年轻的科学家都投入到这一项研究工作中来。“many a+名词单数’’作主语时,谓语动词应用单数形式。另外,be engaged in是固定搭配,表示“忙于,从事于”。

  • 第4题:

    The work()by the time you get there.

    • A、will have been done
    • B、was done
    • C、had been done
    • D、has done

    正确答案:A

  • 第5题:

    Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

    • A、Integration
    • B、Scope
    • C、Configuration
    • D、Requirement

    正确答案:D

  • 第6题:

    A System p administrator has been instructed to verify that all filesets have all required requisitesand are completely installed. Which of the following commands will provide this information()

    • A、lslpp
    • B、lppchk
    • C、geninstall
    • D、installp

    正确答案:B

  • 第7题:

    Which two applications can be used to view actual costs for labor, materials, services, and tools?()

    • A、 Labor Reporting
    • B、 Quick Reporting
    • C、 Work Order Tracking
    • D、 Assignment Manager
    • E、 Work Order Management

    正确答案:B,C

  • 第8题:

    单选题
    Which of the following is required to ensure the completion of all tests within the automated procedure of thecluster test tool?()
    A

    Application monitoring has been configured

    B

    Only disk heartbeat networks have been used

    C

    Cluster nodes are attached to two IP networks

    D

    Resource Group dependencies have been configured


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()
    A

    All maintenance personnel have full access to all records.

    B

    All maintenance personnel have read-only access to all data. 

    C

    Only a very limited number of personnel have full access to static data records, but all maintenance personnel are able to enter work order data.

    D

    Maintenance personnel should not be using the system, and should only write entries on printed work orders and hire input clerks to enter these into the system.


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
    A

    Integration

    B

    Scope

    C

    Configuration

    D

    Requirement


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.
    A

    Integration

    B

    Scope

    C

    Configuration

    D

    Requirement


    正确答案: B
    解析: 该题的关键词为"all the work required, only the work required",其语句结构为"Project()Management(主语)includes(谓语)the processes",含义为"项目什么管理包含过程",仅根据关键词便可判断出应该与项目范围管理紧密相关,在结合语句分析,应该选择项目范围管理,即Scope。

  • 第12题:

    单选题
    What does the review state about the book?
    A

    It has been comprehensively researched.

    B

    It is not a professional piece of work.

    C

    It deals with the subject impartially.

    D

    It does not have a list of sources.


    正确答案: C
    解析:
    通过书评的整体内容可知是对Sparks的著作进行的批判,第3段第1句指出,the most unprofessional aspect是书中大部分内容是根据Courtnery Rosen的证言写的。故选B。

  • 第13题:

    The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope. (74) could provide the fund to cover the newly discovered work item.

    A.Contingency reserve
    B.Project profit
    C.Management reserve
    D.Special fund

    答案:C
    解析:
    项目的预算还未最终确定,额外的工作已经发现,没有计划的预算或并不在项目范围内。管理储备可以提供该基金支付新发现的工作项。

  • 第14题:

    ()includes the processes required to ensure that the project includes all the work required,and only the work required,to compete the project successfully.Managing the project scope is primarily concerned with defining and controlling what is not included in the project.

    A:Create scopE
    B:Project stakeholder management
    C:Project scope management
    D:Project cost management

    答案:C
    解析:

  • 第15题:

    In order to()your goals, you must work hard.

    • A、make
    • B、achieve   
    • C、require
    • D、develop

    正确答案:B

  • 第16题:

    A system administrator has been instructed to verify that all filesets have all required requisites and are completely installed. Which command will provide this information?()

    • A、lslpp
    • B、lppchk
    • C、instfix
    • D、installp

    正确答案:B

  • 第17题:

    A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

    • A、Ensure Director Agent is installed on the new servers.
    • B、Ensure a DHCP Sever is installed and configured in the environment.
    • C、Ensure Server Plus Pack option has been installed and configured.
    • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
    • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

    正确答案:B,E

  • 第18题:

    A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()

    • A、All maintenance personnel have full access to all records.
    • B、All maintenance personnel have read-only access to all data. 
    • C、Only a very limited number of personnel have full access to static data records, but all maintenance personnel are able to enter work order data.
    • D、Maintenance personnel should not be using the system, and should only write entries on printed work orders and hire input clerks to enter these into the system.

    正确答案:C

  • 第19题:

    A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work order, after a maintenance manager has approved the work order? ()

    • A、 Approved (APPR)
    • B、 Waiting on Materials (WMATL)
    • C、 Waiting to be Scheduled (WSCH)
    • D、 Waiting on Plant Condition (WPCOND)

    正确答案:B

  • 第20题:

    单选题
    A System p administrator has been instructed to verify that all filesets have all required requisitesand are completely installed. Which of the following commands will provide this information()
    A

    lslpp

    B

    lppchk

    C

    geninstall

    D

    installp


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A system administrator has been instructed to verify that all filesets have all required requisites and are completely installed. Which command will provide this information?()
    A

    lslpp

    B

    lppchk

    C

    instfix

    D

    installp


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    What are the conditions,under GMDSS,whereby a ship is NOT allowed to depart from any port? ()
    A

    The vessel is not capable of performing all required distress and safety functions

    B

    The vessel is carrying more than the required number of qualified GMDSS radio operators

    C

    The vessel has a temporary waiver of its radio license and Safety Certificate

    D

    The vessel is not carrying a GMDSS radio maintainer,but has provided for shoreside maintenance plus duplication of equipment if required


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    Using the C-SPOC utilities, an administrator has created a new volume group and filesytems. Theadministrator performs an Isvg -I command on the volume group and notices that the log logical volume created in C-SPOC is closed/syncd and loglv01 has been created and is in use.  What step was required in order for the logfile created by C-SPOC to be used.()
    A

     Perform the C-SPOC logform utility option prior to creating any filesystems.

    B

     Manually perform a logform outside of C-SPOC prior to creating any filesystems.

    C

     Run a logredo command and select log logical volume created in C-SPOC as the preferred jfslog.

    D

     Use C-SPOC to delete and recreate the log logical volume,set the perform logform option to true.


    正确答案: A
    解析: 暂无解析