Replace all incandescent lighting with energy saving neon lighting.
Set an auto-shutoff policy for all the lights in the room to reduce energy consumption after hours.
Replace all incandescent lighting with energy saving fluorescent lighting.
Consolidate server systems into a lower number of racks,centralizing airflow and cooling in the room.
第1题:
Which of the following should be included in the network diagram?()
第2题:
Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?()
第3题:
Which of the following can conserve energy in a server room?()
第4题:
A small business has had unauthorized people enter their server room and damage their servers.Which of the following locks for the door would BEST prevent unauthorized people from accessing the server room?()
第5题:
The server room that an administrator manages has just caught fire. Which of the following is the FIRST thing that the administrator should do?()
第6题:
Server room access should be limited to authorized personnel.
Servers should be kept in a warm and dark environment.
Remove the floppy drives from the system.
The server administrator should ensure adequate levels of cooling.
第7题:
Replace all incandescent lighting with energy saving neon lighting.
Set an auto-shutoff policy for all the lights in the room to reduce energy consumption after hours.
Replace all incandescent lighting with energy saving fluorescent lighting.
Consolidate server systems into a lower number of racks,centralizing airflow and cooling in the room.
第8题:
Biometric
Keypad
Barcode
Key lock
第9题:
Load on UPS
Rack temperature
Room temperature
Ease of access
第10题:
TCP/IP settings
RAID configuration
Whether the power cord is attached
Server room access log
第11题:
Evacuate all personnel.
Notify staff of the potential service outage.
Use fire suppression techniques until the fire department arrives.
Grab the backup tapes and exit the server room.
第12题:
Evacuate all personnel.
Notify staff of the potential service outage.
Use fire suppression techniques until the fire department arrives.
Grab the backup tapes and exit the server room.
第13题:
An administrator wants to rackmount a new server. Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed. Which of the following items should the administrator FIRST verify before installing the server?()
第14题:
Which of the following is the MOST important factor when considering environmental factors?()
第15题:
A small business currently has a server room with a large cooling system that is appropriate for its size. The location of the server room is the top level of a building. The server room is filled with incandescent lighting that needs to continuously stay on for security purposes. Which of the following would be the MOST cost-effective way for the company to reduce the server rooms energy footprint?()
第16题:
When adding another server to an existing rack mount system, which of the following should the administrator consider FIRST?()
第17题:
Which of the following ensures the MOST secure access to a server room?()
第18题:
To ensure server documentation is kept up to date
To ensure administrators avoid duplicate server names
To ensure server power requirements are met
To ensure the servers can be identified quickly and easily
第19题:
ID card readers
Server rack doors
Biometric devices
Locked doors
第20题:
Turn off all the equipment in the server closet
Install a fan in the server closet
Turn off the power to the server closet
Follow escalation procedures for emergencies
第21题:
Increase the memory on the server.
Reconfigure drives to a RAID 0+1.
Install a battery backed write cache module in the system.
Instruct the user to save to the local system instead of to the server.
第22题:
Server room access should be limited to authorized personnel.
Servers should be kept in a warm and dark environment.
Remove the floppy drives from the system.
The server administrator should ensure adequate levels of cooling.
第23题:
HBA is compatible with the SAN fiber switch.
Update the newly installed server with the latest KVM drivers.
The UPS will continue to perform as expected with the additional load.
Verify the server NIC is compatible with the NAS.
第24题:
Sealing all potential cold air leaks
Installing additional cooling fans
Setting the temperature lower
Replacing the UPS with a generator